Landscaping Is Number 4 on Homeowners’ Top Home Improvement To-Do List

Only 31 percent of homeowners say their do-it-yourself projects have been successfully completed without major problems.

Beautiful Bloom Blooming Px

Thirty-two percent of homeowners have been putting off at least one home improvement project for 12 months or more. And landscaping is in the top five on that list, according to a new study on home improvement site Porch.com.

Home Improvement To-Do List

The study says nine of these jobs on homeowners’ to-do lists “desperately need attention.” This made 57 percent of homeowners feel their homes were still “works in progress.” And, to make matters worse, the study says only 10 percent of homeowners feel they are completely on top of their home maintenance tasks.

Home Improvement: Do-It-Yourself (DIY) or Hire a Pro?

The Porch.com study also asked about whether homeowners tackle a job themselves or hire a professional. Fifty-five percent of homeowners reported trying to take on a job themselves. However, only 31 percent of homeowners say their DIY projects have been successfully completed without major problems. Also, 32 percent of homeowners admit starting a job around the home and abandoning it halfway through, Porch.com’s study says.

When it comes to generational differences, baby boomers were 15.5 percent more experienced than millennials on home repairs. Millennials were less experienced than every generation on 13 out of 21 home repairs surveyed.

American Homeowners’ Top 20 Home Improvement Tasks

  • New paint: 55 percent.
  • Bathroom remodel: 30 percent.
  • New carpet: 28 percent.
  • Landscaping: 27 percent.
  • Kitchen remodel: 27 percent.
  • Drywall repair: 25 percent.
  • Fix/replace door(s): 23 percent.
  • Fix/replace window(s): 22 percent.
  • Flooring repair: 21 percent.
  • Roof repair: 20 percent.
  • Deck/patio repair/installation: 20 percent.
  • Re-caulking: 20 percent.
  • Fix/replace faucet(s): 16 percent.
  • Lighting installation: 15 percent.
  • New tiling: 15 percent.
  • Fix leak: 14 percent.
  • Fix/replace tub/shower: 14 percent.
  • Replace/fix toilet(s): 14 percent.
  • Fix/replace plumbing: 12 percent.
  • Siding repair: 12 percent.
Latest