flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New Life Science Building at University of Washington designed for the next generation of research and teaching

University Buildings

New Life Science Building at University of Washington designed for the next generation of research and teaching

Perkins+Will designed the facility.


By David Malone, Associate Editor | December 12, 2018
LSB South facade exterior

All photos courtesy Kevin Scott

The University of Washington Biology department educates more STEM students than any other program in the state, and now it has a new centerpiece in the Perkins+Will-designed Life Science Building (LSB). The 207,000-sf facility features a separate 20,000-sf research and teaching greenhouse with 2,400 species of plants, and will eventually include a direct connection to the LSB.

LSB was designed for team-focused collaboration with offices, laboratories, and common-use spaces in close proximity to each other. The research and teaching areas are open, modular, and flexible to adapt to emerging research questions that require new methods and instruments. A suspended staircase with oversized landing areas further encourages collaboration while a courtyard and rooftop deck provide outdoors space for students and staff. Perhaps LSB’s most unique element is its elevator core that is wrapped in custom-milled slabs from 200-foot Douglas fir trees.

See Also: Suffolk breaks ground on large housing/dining complex for UMass Dartmouth

 

LSB greenhouse in foreground with main building behind it on UW campus

 

LSB is tracking to LEED Gold and features sustainability elements such as vertical glass solar fins on its exterior, operable windows for natural ventilation, chilled beams and waves, a water reclamation system for greenhouse irrigation, radiant floors, and rooftop solar panels. The vertical solar glass fins alone are anticipated to generate enough electricity to light more than 12,400 sf of offices throughout the year.

In addition to Perkins+Will, the build team included: Coughlin Porter Lundeen (SE and CE), Affiliated Engineers (mechanical and electrical engineering), Skanska USA (general contractor), McKinstry (mechanical contractor), VECA Electric (electrical contractor), and Gustafson Guthrie Nichol (landscape architect).

 

LSB interior with Douglas Fir wood on display

 

LSB lab space

 

Student walks passed Douglas fir cladding in LSB

 

The west facade of UW's LSB

 

Students in LSB's break room and common space

Related Stories

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

University Buildings | Apr 10, 2024

Columbia University to begin construction on New York City’s first all-electric academic research building

Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces. 

Sports and Recreational Facilities | Apr 2, 2024

How university rec centers are evolving to support wellbeing

In a LinkedIn Live, Recreation & Wellbeing’s Sadat Khan and Abby Diehl joined HOK architect Emily Ostertag to discuss the growing trend to design and program rec centers to support mental wellbeing and holistic health.

Student Housing | Feb 21, 2024

Student housing preleasing continues to grow at record pace

Student housing preleasing continues to be robust even as rent growth has decelerated, according to the latest Yardi Matrix National Student Housing Report.

University Buildings | Feb 21, 2024

University design to help meet the demand for health professionals

Virginia Commonwealth University is a Page client, and the Dean of the College of Health Professions took time to talk about a pressing healthcare industry need that schools—and architects—can help address.

Higher Education | Feb 9, 2024

Disability and architecture: ADA and universal design at college campuses

To help people with disabilities feel part of the campus community, higher education institutions and architects must strive to create settings that not only adhere to but also exceed ADA guidelines.

Laboratories | Jan 25, 2024

Tactical issues for renovating university research buildings

Matthew Plecity, AIA, ASLA, Principal, GBBN, highlights the connection between the built environment and laboratory research, and weighs the benefits of renovation vs. new construction.

University Buildings | Jan 18, 2024

Houston’s Rice University opens the largest research facility on its core campus

Designed by Skidmore, Owings & Merrill (SOM), the 251,400-sf building provides students and researchers with state-of-the-art laboratories, classrooms, offices, and a cafe, in addition to multiple gathering spaces.

Sponsored | BD+C University Course | Jan 17, 2024

Waterproofing deep foundations for new construction

This continuing education course, by Walter P Moore's Amos Chan, P.E., BECxP, CxA+BE, covers design considerations for below-grade waterproofing for new construction, the types of below-grade systems available, and specific concerns associated with waterproofing deep foundations.

University Buildings | Jan 15, 2024

The death of single-use university buildings

As institutions aim to improve the lives of their students and the spaces they inhabit, flexible university buildings may provide an all-in-one solution.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021