Metrics for BIM – Total Cost of Ownership and Facility Life-cycle Management


BIM Metrics

If you think the value of BIM is in pretty 3D pictures, don’t both to read the attached article…   there is too much for you to learn.    Remember…  “you can’t manage what you don’t measure.”

Metrics/Cost Models

􀀹 FCI (Facility Condition Index) = DM (Deferred Maintenance) + CR (Capital Renewal)/
CRV (Current Replacement Value)
􀀹 AI (Adaptive Index) or PI (Programmatic Index) = PR (Program Requirements)/
CRV (Current Replacement Value)
􀀹 FQI (Facility Quality Index) or Quality Index or Index = FCI (Facility Condition Index)+ AI (Adaptive Index)
􀀹 Annualized Total Cost of Ownership (TCO) per building per gross area = Rate per square foot
􀀹 Annualized TCO per building/Current replacement value = Percent of Current Replacement Value (CRV)
􀀹 Annualized TCO per building/Net assignable square feet = Cost rate per net assignable square
feet per building
􀀹 Annualized TCO per building/Non-assignable square feet = Cost rate per non-assignable square
feet per building
􀀹 Annualized TCO per building/Building Interior square feet = Cost rate per interior square foot per
building
􀀹 Total Cost (inclusive of construction, design, project management, etc.)/square foot vs. Regionalized
Applicable Standard Reference Cost, Percent Variance
􀀹 AI (Adaptation Index) or PI (Programmatic Index) = PR (Program Requirements)/
CRV (Current Replacement Value)
􀀹 Uptime or Downtime – Defined in percent, as amount of time asset is suitable for the program(s)
served.
􀀹 Facility Operating Gross Square Foot (GSF) Index (SAM Performance Indicator: APPA 2003)
􀀹 Custodial Costs per square foot
􀀹 Grounds Keeping Costs per square foot
􀀹 Energy Costs per square foot
􀀹 Energy Usage
􀀹 Utility Costs per square foot
􀀹 Waste Removal Costs per square foot
􀀹 Facility Operating Current Replacement Value (CRV) Index (SAM Performance Indicator: APPA 2003)
􀀹 Churn Rate
􀀹 Utilization Rate
􀀹 Planned/Preventive Maintenance Costs per square foot
􀀹 Emergency Maintenance Costs as a percentage of Annual Operations Expenditures.
􀀹 Unscheduled/Unplanned Maintenance Costs as a percentage of Annual Operations Expenditures.
􀀹 Repair costs (man hours and materials) as a percentage of Annual Operations Expenditures
􀀹 FCI (Facility Condition Index) = DM (Deferred Maintenance) + CR (Capital Renewal)/
CRV (Current Replacement Value)
􀀹 Recapitalization Rate, Reinvestment Rate
􀀹 Deferred Maintenance Backlog
􀀹 Facilities Deterioration Rate

Leave a comment