article thumbnail

Construction Equation: Knowledge Problems + Data Problems + Management Problems = Outcome Problems

Job Order Contracting

Life Cycle Costing as an Important Contribution to Feasibility Study Construction Projects. Procedia Engineering. Janz, D., & Westkämper, E. Design to Life Cycle by Value-Oriented Life Cycle Costing. In Advances in Life Cycle Engineering for Sustainable Manufacturing Businesses. Kirkham, R. Construction Management and Economics.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Elsewhere, it is defined as the total cost of project measured over a period of financial interest of the clients (Flanagan and Jewell, 2005). 2005), Whole life appraisal for construction. LCC enables a practical economic comparison of the alternatives, in terms of both the present and future costs. 12004 pp9-19 ISSN 0969-9988.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

FEATURE STORY: Talking The Talk And Backing It Up With Results

Buisness Facilities Contributed Content

Perry bragging rights is the Texas Emerging Technology Fund (TETF), a $200-million initiative created by the TX Legislature in 2005 (it has been reauthorized every year since). Perry has supported pilot projects to assess the feasibility of large-scale seawater desalination plants on the Texas Gulf Coast.

Texas 49
article thumbnail

Our 2022 Builder of the Year, Van Metre Homes, Is Wired for Change

Pro Builder

It’s the next logical step in a methodical production-driven process that started with a wall panel and floor-truss factory that opened in 2005 and has since evolved into a multicomponent off-site operation called Building and Strategic Enterprises (BASE), which supplies at least 40% of every new attached and detached home the company builds.

Housing 98
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Energy Innovations Small Grant (EISG) Program: Provides up to $95,000 for hardware projects and $50,000 for modeling projects to small businesses, non-profits, individuals and academic institutions to conduct research that establishes the feasibility of new, innovative energy concepts. For more information, visit this link. 50,000 (max.)

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

SINGLE FACTOR APPORTIONMENT: 2005, Georgia became the first state in the Southeast to adopt a “Single Factor Gross Receipts” apportionment formula. Hawaii-based companies that receive Phase I feasibility study SBIR awards can apply for funds from HTDC’s Hawaii SBIR Matching Grant program.

Income 75
article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

SGICC will use the bulk of the D2PA funds to provide grants to PA-based small companies to demonstrate the feasibility of emerging technologies, or seed funds to test and help launch ideas, and to assist in market acceptance and growth of shale energy focused products or services. Since 2010, the growth of the U.S.