flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

3 ways prefabrication doubles as a sustainability strategy

Modular Building

3 ways prefabrication doubles as a sustainability strategy

As property developers, healthcare providers, and building owners continue to seek ways to construct sustainable facilities that also meet their speed-to-market goals, prefabrication has demonstrated itself to be a useful tool.


By Corie Baker, AIA, EDAC, LEED AP BD+C | Gresham Smith | March 20, 2023
Gresham Smith prefabricated McLaren Greater Lansing Hospital exterior at night
McLaren Greater Lansing Hospital in Lansing, Mich., benefitted from prefabrication when two hospitals needed to be combined into one. Photo courtesy Gresham Smith

In recent years, we’ve seen an accelerated shift towards the use of prefabrication in new construction. Prefabricated building elements can help shorten construction schedules, improve quality control, and provide safer working conditions, making them an attractive option. Furthermore, prefabrication can help organizations achieve their own sustainability goals related to waste, energy reduction, and healthy environments.

At Gresham Smith, we’ve followed this trend and have utilized prefabricated building components on a wide range of project types. In this post I’ll explore why and how prefabrication reduces waste, lowers energy consumption during construction, and creates a healthier indoor environment—making it a smart strategy for supporting your sustainability goals.

Utilizing Prefabrication as a Sustainability Strategy
 

1. Intuitive waste reduction

During a traditional construction process, waste is generated from leftover materials, packaging, inefficient design, lost or dropped supplies, such as nails and bolts, and damaged materials. According to the Environmental Protection Agency’s 2018 Advancing Sustainable Materials Management Fact Sheet, more than 600 million tons of construction and demolition waste was generated in the U.S. in 2018.

Mount Carmel Grove City prefabrication healthcare facility exterior
With a focus on enhancing the patient experience through a cutting-edge healthcare facility, Mount Carmel Health System built a new full-service teaching hospital and medical office building at its Grove City campus in Ohio. Photo courtesy Gresham Smith

On the other hand, prefabricated elements can significantly reduce construction waste; in a 2021 study, several researchers at the University of New South Wales found that modular construction reduced the overall weight of waste by up to 83.2% for the cases considered. This can be attributed to the fact that prefabricated building elements are made in a controlled factory, so recycling and waste reduction are simplified.

The upfront planning involved with integrating prefabricated elements into a design reduces the probability of rework, which in turn decreases the amount of waste generated. Additionally, that preplanning makes the best use of material lengths, minimizing waste from material cuts. And, since these elements are constructed in a controlled indoor environment, damage from weather is not a concern.

In the case of Mount Carmel Grove City, our team found a way to use prefabricated materials to create a modular patient room design, resulting in a “kit of parts” construction process. In the end, this enhanced construction quality, reduced waste, and minimized the environmental impact.

2. Energy reduction during construction

Prefabricated building materials also reduce energy consumption during construction. According to a report published by design, engineering and planning firm Arup, up to 67% less energy is involved in the construction of a building that uses modular construction. Multiple factors contribute to this reduction.

BOE Chengdu Digital Hospital prefabrication building
The BOE Chengdu Digital Hospital in Sichuan, China, encompasses more than four million sf and is designed to accommodate an estimated 6,000 daily outpatient visits. Photo courtesy Gresham Smith

First, there’s a greater ability to control the level of energy use in a factory setting. Additionally, a factory environment presents more opportunities to utilize renewables sources of energy during the construction process. Prefabrication also often means a shorter construction schedule, thereby using less energy on-site during the construction process.

For the BOE Chengdu Digital Hospital, using prefabricated components in its architectural and structural systems allowed the hospital to go from initial design to completion in just 45 months. This strategy also reduced the amount of energy used during construction.

3. Indoor environmental health benefits

Not only does prefabrication reduce waste and energy consumption, but prefabrication also creates a cleaner, healthier indoor environment. Prefabricated elements are constructed in a factory, rather than onsite, which means the dust and air pollutants generated by the manufacturing process, as well as the adhesives, sealants and chemicals used, can be more carefully controlled and workers can be better protected.

Additionally, prefabricated elements often have more time to off-gas before they are transported to the project site and installed.

Baptist Health Care’s New Brent Lane Campus prefabrication construction
Baptist Health Care’s New Brent Lane Campus spans 57 acres in Pensacola, Flo., and was constructed in just 48 months. Photo courtesy Gresham Smith

The new Baptist Health Care campus includes a 10-story, 264-bed hospital, a six-story 180,000-sf medical office building, a 72-bed behavioral health unit, and a new central energy plant. In order to support the client’s sustainability goals, the design incorporated prefabricated elements in the steel structure, the precast envelope panels, the interior wall partitions, the patient toilet pods ,and the mechanical, electrical, and plumbing runs. The prefabrication strategy allowed this campus to be designed and constructed in just 48 months.

Prefabrication is Here to Stay 

The benefits of prefabrication have been tested and proven, giving architects a viable option for shaping the built environment to suit human need while also promoting sustainability. As property developers, healthcare providers and building owners continue to seek ways to construct sustainable facilities that also meet their speed-to-market goals, prefabrication has demonstrated itself to be a useful tool.

More from Author

Gresham Smith | Aug 17, 2023

How to design for adaptive reuse: Don’t reinvent the wheel

Gresham Smith demonstrates the opportunities of adaptive reuse, specifically reusing empty big-box retail and malls, many of which sit unused or underutilized across the country.

Gresham Smith | May 24, 2023

Designing spaces that promote enrollment

Alyson Mandeville, Higher Education Practice Leader, argues that colleges and universities need to shift their business model—with the help of designers.

Gresham Smith | Apr 24, 2023

Smart savings: Commissioning for the hybrid workplace

Joe Crowe, Senior Mechanical Engineer, Gresham Smith, shares smart savings tips for facility managers and building owners of hybrid workplaces.

Gresham Smith | Jan 19, 2023

Maximizing access for everyone: A closer look at universal design in healthcare facilities

Maria Sanchez, Interior Designer at Gresham Smith, shares how universal design bolsters empathy and equity in healthcare facilities.

Gresham Smith | Dec 20, 2022

Designing for a first-in-the-world proton therapy cancer treatment system

Gresham Smith begins designing four proton therapy vaults for a Flint, Mich., medical center.

Gresham Smith | Nov 21, 2022

An inside look at the airport industry's plan to develop a digital twin guidebook

Zoë Fisher, AIA explores how design strategies are changing the way we deliver and design projects in the post-pandemic world.

Gresham Smith | Feb 13, 2022

Helping maximize project dollars: Utility coordination 101

In this post, I take a look at the utility coordination services our Transportation group offers to our clients in an attempt to minimize delays and avoid unforeseen costs.

Gresham Smith | May 7, 2021

Private practice: Designing healthcare spaces that promote patient privacy

If a facility violates HIPAA rules, the penalty can be costly to both their reputation and wallet, with fines up to $250,000 depending on the severity.

Gresham Smith | Mar 4, 2021

Behavior mapping: Taking care of the caregivers through technology

Research suggests that the built environment may help reduce burnout.

Gresham Smith | Feb 10, 2021

Using technology to design better and safer spaces

Our new technology called Gresham Smith’s Empathic Analytics allows us to measure and record a user’s perceived safety.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021