article thumbnail

Connect processes and teams across the project lifecycle

ENR Construction

In just a few minutes, see how Oracle Aconex can drive efficiency in design and construction coordination, project controls, cost management, document management and field management. An inside look at integrated project controls.

Aconex 67
article thumbnail

Dropbox Syncs Up With Project Management Software Suites

ENR Construction

Building on a late 2017 partnership with Autodesk to support file transfers within AutoCAD, cloud-based data storage company Dropbox now is adding document format support and software integration for the Aconex, BulldozAIR, Fieldwire and PlanGrid project data management systems as well.

Aconex 34
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Don’t shoot for Paperless – Go Drawingless!

DebunkTheBIM

I believe, that, it is the way objects are represented that is important, as opposed to what they are represented on; Many practitioners claim to be going BIM way by loading up zillions of sheets of digital files onto Aconex instead of printing them. Look up my post on the PictureBook Documenting. I also introduced you to the POD.

Aconex 48
article thumbnail

BIM 360: One small step forward for Autodesk = Two huge steps backwards for the global AEC industry

DebunkTheBIM

Indeed, this is the case of Autodesk realizing that the true bread and butter of the industry is based on doing large projects and clipping the ticket on shifting mountains of 2D documents around, with a bit of 3D thrown in for keeping up appearances. And BIM is going on the back seat big time.

article thumbnail

The Future Of Construction – BIM

Lets Build

In this phase, the production and sharing of the information are taking place with the help of paper and non-interoperable electronic documents. Softwares like Aconex or Viewpoint can be used as the CDE. It’s the 4D (GenieBelt) which is related to time management and the 5D (Aconex) which is linked to the calculation of the budget.

BIM 168