article thumbnail

Civil Engineering Software | List of Civil Engineering Software | List of Engineering Software

CivilJungle

List of Civil Engineering Software: This software are substantially beneficial in Construction projects. Software Required for 3d Modeling of Structure/Architecture. Utilized in most structural design consultancies and firms. #1b. Primavera is a construction Planning and Scheduling software. #1e. Primavera P6.

article thumbnail

CAD Shack: Add Structural Steel with Revit MEP

CAD Shack

This week I needed to create some structure from the structural engineers AutoCAD plans since they were not using Revit. The way I got around the above mentioned error was to open a structural model I received from a different engineer on a different job. CAD Shack VIPs. CAD Shack Blog Buddies.

CAD 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

When is a discrepancy not really a discrepancy?

DebunkTheBIM

The structural engineer sizes the concrete column; the architect places it in the space. There is a code on the structural drawing that can be tracked to the schedule and the dimensions are noted. They both are confident to be following well established building-documenting practices.

article thumbnail

Meet the Insider: Cliff Cole, Director of VDC at the PENTA Building Group

Autodesk Construction Cloud

Industry data shows that 70% of contractors think advanced technologies can boost productivity; plus, many construction professionals believe that tech can improve scheduling (78%) and enhance safety (75%). After two years, I headed west to Las Vegas to work for The PENTA Building Group, starting as a Project Engineer.

article thumbnail

How To Prepare A Construction Plan

cnstrctr

The document is typically composed of the following: A narrative or written document outlining how the various components will be approached Drawings and illustrations indicating temporary construction and phasing Photographs and images A detailed or milestone construction schedule. Milestone or High Level Schedule. Sequence Of Work.

Plans 74
article thumbnail

SHOP DRAWING creates maximum benefits for construction companies

Construction Cost Estimating

The shop drawing is a drawing or collection of set of drawings, diagrams, illustrations, schedules, and other data or information specifically generated or assembled by the contractor, supplier, manufacturer, subcontractor, or fabricator to demonstrate some portion of the work for the approval of architect or engineer.

article thumbnail

BIM IP

Building Information Management

The architect schedules doors, the hardware supplier adds to that schedule, they don’t create their own. The architect doesn’t model ductwork, they use the mechanical engineer’s model. CAD files). Editable schedules from the BIM model (e.g. But the theft itself is no easier. LOSS OF CONTROL.

BIM 40