article thumbnail

Shopping Mall Development Trends: Are Ghost Kitchens the Answer for Vacant Mall Space?

HardHatChat

By comparison, the ghost kitchen trend is largely being driven by the growing popularity of food delivery apps such as Grubhub and Uber Eats. But ultimately, the consideration of this type of non-traditional concept is definitely the kind of out-of-the-box thinking needed to help the retail sector regain its footing.

Retail 177
article thumbnail

Tackle Any Schedule Change with Autodesk BuildĀ 

Autodesk Construction Cloud

Digitizing Version Comparison . The manual process of the past — comparing line item by line item on paper print outs or switching between two monitors — is just not a feasible solution when it comes to schedules that involve thousands of activities. . See Version Management and Comparison in Action .

Autodesk 105
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

SPECIAL REPORT: Site Location Factors For Automotive Suppliers

Buisness Facilities Contributed Content

Site utilization for automotive suppliers from a feasibility, cost, and developmental risk perspective is typically driven by confirmation that the following location criteria are satisfied: Size, shape, topography and room for future expansion; site buffer should provide protection from residential and commercial neighbors.

Site 60
article thumbnail

#104:Ā  Proving Lost Productivity Claims

NH Construction Law

Because it requires a comparison of impacted and unimpacted periods of work, “measured mile” methodology on a single project won’t be available if the entire work was impacted from Day One. ” Axenics, Inc. Turner Construction Co. LEXIS 6, at *39 (March 1, 2011). Yup, time for the paperwork lecture!)

Claims 40
article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Analytical comparisons of the two techniques are then presented in section V as discussion. LCC enables a practical economic comparison of the alternatives, in terms of both the present and future costs. In section IV, the principle and methodology of value management were discussed.

article thumbnail

Federal Facilities ā€“ Implementation of Energy Savings Projects and Performance-Based Contracting for Energy Savings

Building Information Management

Learn more: Software , JOC White Paper , A Comparison of Cost Estimation Software Tools. a) Agencies shall, where technically feasible, continue efforts to connect meters and advanced metering devices to enterprise energy management systems to streamline and optimize measurement, management, and reporting of facility energy use.

article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

In some cases, soil testing by a civil, geotechnical, or soils engineer is better to assist formulate a feasible arrange. That method you''ll get competitive bids from deck specialists for comparison, or hold off on the project for a later date. Steep sites might have retentive walls or different approaches to soil stabilization.