Unfit planning system means 4,700-year wait for onshore wind

Aaron Morby 12 months ago
Share

The current planning system will fail to deliver the Government’s ambitions to build infrastructure to meet net zero goals and housing needs.

That is the conclusion of a damning report by the Institute for Public Policy Research, which is calling for a complete reset of planning.

It warns that it would take 4,700 years for England to reach the onshore wind capacity called for by government advisers, at the current rate of development.

Progress in England was stalled in 2015 when planning laws were changed to make it more difficult to gain permission for new onshore wind turbines – in what was effectively a ban. 

Since then only 17 onshore wind farms have been approved, generating just 6.7 megawatts of power – equivalent to just 0.02% of the on-shore total needed in England based on National Grid estimates.

The IPPR report calls for restrictions on onshore wind and solar power to be reduced and for local authorities to be compelled to identify land suitable for onshore wind and solar generation. 

It also calls for big planning reforms to get many more houses built, while also moving faster to meet net zero targets.

In particular, the report calls for decisions on new home building to be linked into plans for low-carbon transport networks.

Between them, housing and transport account for over 40% of total emissions, but since 1990 emissions from both sectors have barely declined. 

The report also sheds fresh light on the critical failures of the current system. These include the lack of clear rules for developers and local authorities on when planning permission should be granted, leading to uncertainty and speculative buying of land. 

It argues that local authorities should be compelled to draw up detailed plans for development in their areas that integrate environmental targets, to provide greater certainty.

It proposes that if a planned house building project meets new net zero targets alongside other local requirements, it should be given an automatic green light, removing much of councils’ discretion from the system. 

It calls for national and local house building targets to be reinstated so that councils can be compelled to enable more homes to be built. 

But the report calls for the public to be given a more meaningful say over the future of their local areas than they do at present. 

Luke Murphy, IPPR associate director for energy, climate, housing, and infrastructure, said: “The current planning system in England is not remotely fit for purpose to build a net zero world, restore nature, or meet housing need.

“Fundamental planning reform is needed to accelerate efforts to reduce emissions and restore nature, rollout renewable energy generation, and to deliver the level of housebuilding that the country so desperately needs.”

 

Latest news

Aluminium cladding specialist collapses

Melton Mowbray-based firm worked for several main contractors
14 mins ago

Brickwork contractor Lee Marley returns to profit

Affordable and rental homes demand lifts brickwork contractor
28 mins ago

Housing contractor Durkan suffers second year of losses

More fire safety provisions tip firm into £3.9m loss
1 hour ago

Farrans makes breakthrough on tricky tunnel job

Tunnel under Tees latest part of new £155m water pipeline job
31 mins ago

Heidelberg buys aggregates and earthworks specialist B&A

Latest deal follows acquisition of Mick George
54 mins ago

Flagship biodiversity net gain scheme flawed

NAO warns Government's flagship green development scheme at risk of failure
3 days ago

Plan in for £3bn Lincolnshire mega data centre

3.3m sq ft Humber Tech Park will be one of Europe's largest data centres
3 days ago

Green light for Digbeth 1,300 homes scheme

Warner’s Fields scheme to start with excavation and landscaping of the River Rea
3 days ago

£210m M3 Junction 9 upgrade gains consent

VolkerFitzpatrick to start work in early 2025 on Winnall roundabout, near Winchester
3 days ago

United Living wins 14-year L&Q homes repairs deal

Trafford housing upkeep deal worth £205m
3 days ago

£400m Lewisham resi-led scheme advances

Land deal paves way for Amro Partners' 1,000-home London scheme
3 days ago

McLaren gets go-ahead for Grade II listed Leeds student scheme

Springfield House to be revamped and two new wings added
3 days ago

Piling giant to fit people alarms on all rigs

Cementation Skanska upgrades site safety systems
3 days ago

Vistry to make £800m profit after subcontractor cost cuts

House builder bullish about shareholder returns after asking suppliers for discounts
4 days ago

Shareholders approve £2.5bn Barratt and Redrow merger

Final hurdle is for the competition regulator to approve the deal.
4 days ago

Green light for £80m Leith waterfront revamp

Build-to-rent homes and student accommodation scheme to be built
4 days ago

Tilbury Douglas clears Interserve legacy jobs to return to profit

Revenue tops £500m in first year as standalone contractor
5 days ago

Land deal paves way for Manchester civil service office hub

Government buys five acres at former Central Retail Park
4 days ago

Speller Metcalfe wins Wolverhampton library upgrade

Full works are due to start in the autumn
4 days ago

Skills shortage puts big infrastructure projects at risk

Government failing as an intelligent client and now over-reliant on consultancies
5 days ago

Contractors face further insulation board price hikes

Cost of PIR insulation boards set to rise another 10%
5 days ago

Henry Boot wins £36m Rotherham Markets job

Project involves upgrading existing market and building a new library
5 days ago

Keltbray hires new head of infrastructure procurement

Lukasz Olszewski will oversee rail, energy and highways business units
5 days ago

Tunnel fit out robot to revolutionise civils work

Costain and VVB Engineering part of innovative consortium
5 days ago

Funding deal for £86m wind turbine test centre

Latest investment at National Renewable Energy Centre in Blyth
6 days ago

Plan in for Manchester ‘upside-down’ 18-storey tower

Landmark cantilevered NXQ building plan for city Northern Quarter
6 days ago

London 25km Super Sewer hooked up for commissioning

Tideway completes connection to existing Lee Tunnel sewer system
6 days ago

£200m Lincoln ring-road approved

North Hykeham Relief Road granted planning permission
6 days ago

£1bn Manchester Airport City plan rebooted as new sci-tech hub

Plan pivots from offices to science and manufacturing campus, called MIX Manchester
7 days ago

Record results at maintenance specialist Renew

Infrastructure maintenance work continues to pay off for contractor
6 days ago

Contractor services