Offsite Solutions lands £5m Downing deal

Grant Prior 10 months ago Offsite Solutions
Share

Offsite Solutions has been awarded two contracts totalling £5m for nearly 1,500 bathroom pods for Downing’s first co-living scheme.

Designed by Simpson Haugh, Square Gardens is a £400m co-living scheme in Manchester developed and built by Downing, which will provide new homes for rent – a mix of private studios to five-bedroom apartments.

This project is also the very first application of Offsite Solutions’ new large format tile-effect finish for its GRP bathroom pods. An expanded range of finishes have recently been developed to widen the scope of factory-finished GRP shower rooms and bathrooms specifically for the build-to-rent sector.

Offsite Solutions is manufacturing 1,487 GRP shower rooms and ensuite bathrooms for towers A, B and block D up to the 17th storey. All the pods will be supplied floorless – a highly efficient solution to minimise floor build-up on high-rise apartment projects.

Andy Thomas, Operations Director at Downing, said: “Manufacturing bathrooms offsite gives us a huge benefit in terms of programme, reduction of waste on site and certainty in quality.  Our demand for pods is pretty high once the internal fitout process starts on site, so keeping up with our programme is absolutely critical for Downing.

“Pod technology continues to advance. At Square Gardens we are utilising new higher specification GRP finishes and floorless pods. We are happy with the level of quality and finish that Offsite Solutions achieves with its bathroom pods for Downing and have a good relationship with their organisation at every level.”

James Stephens, Managing Director of Offsite Solutions said: “Downing is one of our longest standing clients. We have provided GRP bathroom pods which have been rolled out on multiple student living schemes developed by Downing across the UK for more than 10 years. We are delighted to now be working on their major co-living development in the heart of Manchester.

“Over the life of GRP pods, we estimate that the operating cost saving is at least 90 per cent more than in-situ bathroom construction. GRP pod technology continues to advance and we have now developed a series of new aesthetic options and features that developers can specify to further enhance tenant appeal in the shared living space.

“We can also engineer standardised designs that developers can specify for multiple schemes – as we have done for many years with Downing – further increasing the efficiency of construction and optimising all the benefits of offsite manufacturing.”

All the pods will feature Offsite Solutions’ newly developed large format tile-effect finish in matt white – removing the need for porcelain tiles and grout lines to the wet areas. This option significantly reduces maintenance costs for retained assets.

Latest suppliers & buyers news

Conquip BulkX makes site excavations easier

Specialist can make life easier for civils contractors

SRL appoints Mark Eburne as CEO

New leader at traffic management specialist
4 days ago
SRL Traffic Systems

Trio of new products from Altrad RMD Kwikform

Latest solutions will make life easier for contractors
2 weeks ago

Walker Modular lands £5m bathroom pod contract

Specialist to work with Graham and Watkin Jones on major build-to-rent scheme

JCT launches latest contract updates

Design and Build Contract 2024 Edition now out
3 weeks ago

New MD at Quest to drive company growth

Specialist services contractor appoints Clive Leadbetter

IBMG raises funds for further expansion

£650m revenue Independent Builders Merchant Group looks for more acquisitions
1 month ago
IBMG

New Knauf rainscreen cavity systems make life easier for specifiers

Rocksilk RainScreen Cavity Systems launched
2 months ago

Go Smart card checks set to end within days

Contractors should move to CSCS Smart Check as soon as possible
2 months ago

Milbank delivers precast floors on 100% renewable fuel

Delivery and installation of precast concrete hollowcore floors using only Hydrotreated Vegetable Oil

AGD suppliers latest crawler cranes for HS2

Buyer Total Plant Ltd puts two Sennebogen machines to work in Birmingham
2 months ago
AGD Equipment Ltd

LDD Construction acquires Drill Masters

Latest deal for diamond drilling specialist expands presence in East of England

Conquip launches industry-leading after-sales service

Products and services supplier offers big benefits for contractors

Wernick Group celebrates 90th anniversary

Major milestone for portable and modular buildings specialist
3 months ago
Wernick Group Limited

Quest boosts fleet after ‘try-before-you-buy’ offer

Waste management specialist sings praises of dirty water recycling tanker
3 months ago
Quest Waste Management

AGD takes delivery of powerful new piling rig

Compact Comacchio machine packs a punch
3 months ago
AGD Equipment Ltd

Deanestor lands Robertson school deal

Latest win for fit out specialist
4 months ago
Deanestor

Statom buys another £5.4m of kit from PERI

Concrete specialist seals latest deal with formwork and scaffolding firm
4 months ago
PERI Ltd

New partnership promotes plant crossing safety

SRL Traffic Systems and CLD Physical Security Systems establish hire partnership
4 months ago
SRL Traffic Systems

Go Smart skills card checking to end soon

CSCS scheme leaders urge industry to prepare for new verification system
4 months ago

Core Highways brings all divisions together

Rebranding sees £120m turnover specialist operate as one business
4 months ago

Construction firms co-operate on green wall

Willmott Dixon, FACE Brickwork, Grayson, Speedy Hire and Cemfree showcase carbon cutting methods
4 months ago
Cemfree

Floorplan celebrates 25 years of success

Raised access flooring specialist benefits from exclusive partnership with Italian supplier JVP
5 months ago
Floorplan Systems Ltd

Deanestor lands £3m deal at Passivhaus school

Fitout specialist lands latest contract from Robertson
5 months ago
Deanestor

Offsite Solutions lands £2.4m shower pod deal

Major contract win on McAleer & Rushe student tower
6 months ago
Offsite Solutions

J3 arranges insurance deal on £55m McGoff resi scheme

Independent insurance and finance advisory continues to win work in new build market
6 months ago

Revamp for CSCS skills card website

Overhaul makes it easier to get the right card
6 months ago

IBMG strengthens senior management team

Peter Cudd becomes CCO and Allun Pittingale COO at builders' merchant's chain
6 months ago
IBMG

Vivalda offers “dust free” manufacturing

Cladding specialist offers effective off site cutting service
6 months ago
Vivalda Group plc

AFI Rentals launches carbon offsetting scheme

Customers can offset 100%+ of environmental impact of machines delivery
6 months ago
AFI-Rentals

Firm Quick Find

Join Now

Sorry, there was a problem with the details you have entered. Please review the highlighted fields.

Sorry, this email address has already been registered.

Top searches

Contractor services