How Long are 5 Eyelet Boot Laces?
Work Gearz
MARCH 30, 2021
The standard size of shoe laces run somewhat around 60 to 100 cm in length, but the length generally varies with the number of eyelets present in the boots or the shoes. This is easy to understand as a 4 eyelet boot will definitely have shorter lace length than an 8 or 10 eyelet boot. In general, 5 eyelets boot lace length will be around 36 inches to 45 inches that is 90 to 120 cm in length.
Let's personalize your content