Life Cycle Cost: Category, Costing Technique, and Application

The Constructor

Life cycle cost (LCC) is defined as the cost of an asset or its parts throughout its life cycle while fulfilling the required performance. Whole life.

article thumbnail

Total Cost of Ownership Life-cycle Asset Management – Facilities and other Physical Infrastructure

Job Order Contracting

Efficient life-cycle total cost of ownership management requires the application of LEAN processes and collaborative construction delivery methods. The post Total Cost of Ownership Life-cycle Asset Management – Facilities and other Physical Infrastructure appeared first on 4BT. Learn more? contact-form].

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM Life-cycle Management Competency, Common Terms, and Change Management

Job Order Contracting

BIM Life-cycle Management Competency, Common Terms, and Change Management. Forget 3D visualization, Life-cycle Management Competency and Common Terms are the most critical aspects to achieving efficient renovation, repair, maintenance, sustainability, and new construction of the built environment.

article thumbnail

LEAN Construction Project Delivery enables efficient life-cycle management of the built environment

Job Order Contracting

LEAN Construction Project Delivery enables efficient life-cycle management of the built environment via a robust integration of process, actionable standardized and common information, supporting technology, and ongoing training. An example of LEAN Construction Project Delivery is OpenJOC ™ Job Order Contracting.

article thumbnail

Construction Equation: Knowledge Problems + Data Problems + Management Problems = Outcome Problems

Job Order Contracting

Lack of recognition by senior management of the linkage between between the built environment and organizational mission Low level of understanding of both life-cycle total-cost-of-ownership management and integrated lean planning, procurement, and project delivery principles and processes. Procedia Engineering. Data Problems.

article thumbnail

LEAN Asset Life-cycle Management – Achieve Optimal Construction Outcomes

Job Order Contracting

Optimal construction outcomes such as 90%+ of project on-time and on-budget and 96% satisfaction levels are achieved daily, however, by less than 5% of all real property owners, contractors, architects and engineers. Life-safety, environmental, economic mismanagement are the norm versus the exception. The net result is 2.5%

article thumbnail

Understanding the Difference Between Design-Assist & Delegated Design

Construction Business Owner

The architecture, engineering and construction industries are chock-full of buzzwords and terminology that—although they may be used casually and often—can have different meanings depending on the teams you are speaking to and the role that team or team member plays in the life cycle of a project. . Tue, 11/17/2020 - 15:47.