article thumbnail

Contractor wanted for Super Sewer testing phase

Construction Enquirer

London’s new super sewer client Tideway is set to start the hunt for a contractor to maintain thousands of infrastructure assets through the project’s performance and reliability testing phase. The contractor will also be responsible for any reactive maintenance activities. And with this change of emphasis comes new opportunities.

Sewer 71
article thumbnail

How Does a Sewer System Work? An Illustrated Explanation

Learn Civil Engineering

A sewage system is an essential component of any metropolitan infrastructure since it manages and removes wastewater from residences, businesses, and industrial sources. In this article, we will examine how a sewer system and its components work, emphasizing sewer mains. Sewer Mains Sewer mains […]

Sewer 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Quality, Handling and Installation of Sewer Sanitary Pipes

The Constructor

Quality checking, handling and installation of sewer sanitary pipes requires utmost care. Evaluation of sewer pipe quality and installation practices.

Sewer 189
article thumbnail

Special Construction of Sewer Sanitary Pipe System -Methods and Considerations

The Constructor

Certain conditions may be encountered during sewer sanitary pipe system construction. So, special methods and considerations for sewer pipe.

Sewer 189
article thumbnail

Design and Construction of Flexible Sewer Sanitary Pipes

The Constructor

There are various types of flexible pipes used in of sewer sanitary system. Design and construction of such sewer pipes with calculations are.

Sewer 170
article thumbnail

Jackson, Miss., Sewers Added to Special Manager's Mission

ENR Construction

Third-party interim engineer-manager Ted Henifin now adds city's neglected wastewater system to his portfolio since being named last year by a U.S. judge to run its inadequate and leaking drinking water system.

Sewer 63
article thumbnail

Benjamin Heath: Led Team to Quickly Install Bypass After Vermont Sewer Pipe Failure

ENR Construction

Following Vermont’s record flash flooding last July 10-11 that killed two people and caused about $682 million in infrastructure damage, Benjamin Heath, civil construction manager at Engineers Construction Inc., dia sanitary sewer pipe had breached. received an emergency call from Burlington city officials that a 24-in.-dia

Sewer 36