SABER – JOB ORDER CONTRACTING OPPORTUNITY FOR SMALL BUSINESS CONTRACTORS


job order contracting

Solicitation P15PS00058 is for a Simplified Acquisition of Basic Engineering
Requirements (SABER) contract for construction services (minor design), and will
primarily be used for real property maintenance, repair, alteration, and/or new
construction projects involving linear, underground water and waste water utilities
and related work solely for the use in Grand Teton National Park and the John D.
Rockefeller Jr. Memorial Parkway, Teton County Wyoming.

Magnitude of Construction for the contract (1 base year plus 4 options) is
between $5,000,000 and $10,000,000.

This solicitation is set-aside 100% for Small Business Concerns.

National Park Service – Department of the Interior – NPS, IMR – Northern Rockies MABO
PO Box 168
Mammoth Supply Building #34
Yellowstone NP WY 82190

Contact: Martin Hauch – 307-739-3448
Grand Teton National Park
PO Box 170
Moose, WY 83012
Attn: Martin Hauch

https://www.fbo.gov/?tab=documents&tabmode=form&subtab=core&tabid=1d588ec5ede0accb99189f72bd0aa6f9

The general scopes of the task orders consist of any of the following: linear, underground utility installation or repair/maintenance or new construction; underground gravity or pressure sewage or storm water collection systems and related minor construction (leak detection and repair, line replacement or new installations using different methods, valve replacements, manhole repair/ replacement or installation, minor lift station replacement/repair/installation, leach/absorption field repair/ replacement/ installation, septic tank or collection tank repair/replacement/installation, testing and disinfection, connection to existing systems and buildings, etc.), underground water distribution systems and related minor construction (leak detection and repair, line replacement or new installations using different methods, valve replacement or installation, hydrant and meter replacement or installation, standard testing and disinfection, connection to existing systems or buildings, etc.), water well drilling, development, testing, and permitting, installation of new (simple, kit building or prefabricated) well houses and associated internal piping, valving, metering, water treatment, minor electrical connection (trenching, connection, etc.), internal building finishing (damp proofing, insulation). Work to emphasize replacement or new installation of underground utilities (water, waste water, storm water, minor electrical, miscellaneous conduit and pull string, etc.) using standard trenching, open cut methods, trenchless methods, pipe bursting methods, etc., including different pipe materials (new installation mainly to use HDPE, some existing pipe materials to be connected vary in material). Work to include minor, incidental electrical work (lift station, well house, relocation of utility, repair of damaged utility, etc.), minor plumbing work (connection to existing buildings), minor mechanical work, minor gas/propane distribution work, potential asbestos abatement (from existing, old pipe materials), minor water treatment chemical handling/installation, etc. and any required minimal
design associated with all of the various aforementioned tasks. Also included shall be any incidental work required for completion of the aforementioned tasks, as required and as stated in each Task Order. All designs that require it shall be completed and stamped by registered design professionals, registered in the state in which the project is located and shall meet local, state, and federal regulations. Generally, all required engineering design work including stamping by professional engineers, shall be done by the government and provided to the contractor as part of each task order documentation, SOW (statement of work) drawings, specifications, and design elements. The contractor shall only occasionally be required to provide engineering designs including drawings in AutoCAD format, along with specifications, design calculations, and stamped by a professional engineer in the discipline for which covers the design and licensed in the state of Wyoming. Design work by the contractor shall be minimal and if required, would typically only encompass a small portion of each task order.
All work shall be done in strict accordance with the contract documents, as specified by each individual Task Order.
Use of the SABER will provide the Government with services that can accommodate quick and straight-forward projects.

Contractor’s work and responsibility shall include all contractor planning, programming, administration, and management necessary to provide support for Task Orders awarded. The Contractor shall conduct the work in strict accordance with the contract and all applicable Federal, State, and local laws, regulations, codes, or directives. The Contractor shall provide related services such as preparing and submitting required reports, perform administrative work, and submit necessary information as specified under this contract and within each Task Order. The Contractor shall ensure that all work provided meets the scope of work for each Task Order
and any special specifications included with the individual Task Order or included in any applicable documents.

The Government will provide a detailed scope of work to the Contractor describing the task to be accomplished. Depending on the complexity of the project, the detail provided may vary from a general idea of what is required, with no drawings, to substantially completed or complete design documents. The Contractor shall use the information provided by the Government and submit a complete proposal. The Contractor shall complete all work and services under this contract in accordance with schedules established in each Task Order.

Submittal dates will be included in the Task Order. These dates identify when submittals are due in the issuing office and other addresses identified in the Task Order. Types and numbers of submittals and dates and places for review meetings shall be established by each Task Order.

Task Order minimum and maximum limits are $10,000 and $2,000,000, respectively. The total combined contract capacity under the SABER contract is valued at $10 million.

The Government hereby obligates itself to obtain not less than $10,000 in services per SABER contract for the life of the contract.

http://www.4Clicks.com – e4Clicks Project Estimator – Job Order Contracting, SABER, IDIQ – Industry Leading Cost Estimating and Project Management Software, Training, and Support.