flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

6 must reads for the AEC industry today: April 14, 2020

Market Data

6 must reads for the AEC industry today: April 14, 2020

A robot dog conducts site inspections and going to the library with little kids just got easier.


By BD+C Editors | April 14, 2020

1. A robotic dog becomes part of Swinerton’s construction technology arsenal (BD+C)
"It is using high-definition 3D scanning technology to provide clients with such benefits as time-stamping work with preserved historical data, minimizing client travel thanks to remote walk-through capabilities, and coordinating subcontractors with an eye toward minimizing change orders and errors."

2. City conducts a 'virtual building inspection' to allow Starbucks and bank to open (BD+C)
"Bothell, Wash., issues a certificate of occupancy to developer after inspecting the property online."

3. Family workstations highlight the new Fairfield Area Library (BD+C)
"Quinn Evans collaborated with TMC Furniture to create four custom workstations meant for library patrons and their children. The workstations feature an adult-sized desk for the parent or caregiver attached to a play space outfitted with activities to support early learning."

4. New OSHA COVID-19 Recordability Guidance Provides Necessary Clarification for Contractors (Associated Builders and Contractors)
"ABC is pleased OSHA has clarified its position regarding the recordability of COVID-19 cases under its recordkeeping rules, which provides greater certainty to our member contractors. As a member of the Construction Industry Safety Coalition, we expressed in a March letter to OSHA significant concerns about putting construction contractors in an almost impossible position of determining whether a particular case of COVID-19 that presents in the workplace is considered ‘work-related,’" said ABC's Vice President of Health, Safety, Environment and Workforce Development, Greg Sizemore.

5. CRE's Potential Winners and Losers in a Virus-Hit World (National Real Estate Investor)
"Some property sectors and investor segments may be well-positioned even in a pandemic. Others may be looking at an abyss."

6. WeWork Was Hardly a “Self-Sustaining Business” Before Coronavirus Hit. Its Prospects Now Are “Incredibly Gloomy” (National Real Estate Investor)
"It’s as if co-working giant WeWork absorbed the initial jolt of a 7.0-magnitude earthquake and continues to be rocked by aftershocks."

 

For more top stories from BD+C,  
sign up for the BD+C Daily 5 newsletter

Related Stories

Construction Costs | May 16, 2024

New download: BD+C's May 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

Contractors | May 15, 2024

The average U.S. contractor has 8.4 months worth of construction work in the pipeline, as of April 2024

Associated Builders and Contractors reported that its Construction Backlog Indicator increased to 8.4 months in April, according to an ABC member survey conducted April 22 to May 6. The reading is down 0.5 months from April 2023, but expanded 0.2 months from the prior month.

Healthcare Facilities | May 6, 2024

Hospital construction costs for 2024

Data from Gordian breaks down the average cost per square foot for a three-story hospital across 10 U.S. cities.

Contractors | May 1, 2024

Nonresidential construction spending rises 0.2% in March 2024 to $1.19 trillion

National nonresidential construction spending increased 0.2% in March, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.19 trillion.

AEC Tech | Apr 30, 2024

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 

Hotel Facilities | Apr 24, 2024

The U.S. hotel construction market sees record highs in the first quarter of 2024

As seen in the Q1 2024 U.S. Hotel Construction Pipeline Trend Report from Lodging Econometrics (LE), at the end of the first quarter, there are 6,065 projects with 702,990 rooms in the pipeline. This new all-time high represents a 9% year-over-year (YOY) increase in projects and a 7% YOY increase in rooms compared to last year.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

K-12 Schools | Apr 10, 2024

Surprise, surprise: Students excel in modernized K-12 school buildings

Too many of the nation’s school districts are having to make it work with less-than-ideal educational facilities. But at what cost to student performance and staff satisfaction? 

Multifamily Housing | Apr 9, 2024

March reports record gains in multifamily rent growth in 20 months

Asking rents for multifamily units increased $8 during the month to $1,721; year-over-year growth grew 30 basis points to 0.9 percent—a normal seasonal growth pattern according to Yardi Matrix.

boombox1
boombox2
native1

More In Category

Construction Costs

New download: BD+C's May 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021