Vortex Stump Grinder Skid Steer Attachment

Eterra Attachement's Vortex Stump Grinder, which is being offered by Skid Steer Solutions, is a skid steer attachment designed to remove difficult tree stumps.

Eterra Vortex Stump Grinder 2
Eterra Logo 5970e3412b1b7

Eterra Attachement's Vortex Stump Grinder, which is being offered by Skid Steer Solutions, is a skid steer attachment designed to remove difficult tree stumps.

  • High torque output radial piston motor
  • Robust direct drive system
  • Non-symmetrical wheel
  • Two models available: standard flow with 27-in. wheel (V27) and heavy-duty high flow with 31-in. wheel (V31)
  • Able to be equipped with machines that have between 18 and 45 gpm


Request More Information
Fill out the form below to request more information about Vortex Stump Grinder Skid Steer Attachment
Latest