flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Kimley-Horn eliminates the guesswork of electric vehicle charger site selection

Engineers

Kimley-Horn eliminates the guesswork of electric vehicle charger site selection

Kimley-Horn’s TREDLite EV online tool helps retailers, restaurants, hotels, and governments pinpoint new charger locations.


Kimley-Horn | November 27, 2023
Kimley-Horn eliminates the guesswork of electric vehicle charger site selection
TREDLite EV’s vast dataset includes aggregated and anonymized data on vehicle trips, including trip distance and trip density, and geographic information spanning EV market share, sociodemographic data on drivers and residents, and building types, business types, and housing density.

Private businesses and governments can now choose their new electric vehicle (EV) charger locations with data-driven precision. Kimley-Horn, the national engineering, planning, and design consulting firm, today launched TREDLite EV, a cloud-based tool that helps organizations develop and optimize their EV charger deployment strategies based on the organization’s unique priorities.

The U.S. has 145,000 public Level 2 and direct-current (DC) fast charging ports. To meet 2030’s EV charging needs, the U.S. will need 2.3 million combined Level 2 chargers and DC fast charging ports—16 times today’s number—according to S&P Global Mobility.

“Businesses and governments will play key roles in developing a national network of public EV chargers,” said Jenna McDavid, practice director, zero emission vehicle strategy at Kimley-Horn. “Their challenge is selecting the right sets of sites to meet their unique needs – and doing so quickly and cost-effectively. TREDLite EV makes a science out of site selection.”

TREDLite EV’s vast dataset includes:

  • Aggregated and anonymized data on vehicle trips including trip distance and trip density.
  • Geographic information spanning EV market share, sociodemographic data on drivers and residents, and building types, business types, and housing density.
  • Proximity to high-traffic roadways, highway on-ramps and off-ramps, and existing public chargers.
  • Eligibility maps for state, regional, and federal incentives, including the Justice40 Initiative, which identifies historically disadvantaged communities.
  • Customized client-specific data.

Kimley-Horn has planned, designed, or permitted more than 15,000 EV chargers nationwide. Services include site selection, site feasibility assessment, site design, permitting, utility coordination, and more. Clients include restaurants, coffee shops, movie theaters, retailers, fleet operators, hotels, and local, state, and regional governments.

More from Author

Kimley-Horn | Dec 7, 2023

Kimley-Horn expands expertise with LPDA partnership

Kimley-Horn, a premier engineering, planning, and design consultancy, has joined forces with LPDA, a leading landscape architecture and land planning firm. 

boombox1 - default
boombox2 -
native1 -

More In Category


AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 


Codes and Standards

Updated document details methods of testing fenestration for exterior walls

The Fenestration and Glazing Industry Alliance (FGIA) updated a document serving a recommended practice for determining test methodology for laboratory and field testing of exterior wall systems. The document pertains to products covered by an AAMA standard such as curtain walls, storefronts, window walls, and sloped glazing. AAMA 501-24, Methods of Test for Exterior Walls was last updated in 2015. 


MFPRO+ News

World’s largest 3D printer could create entire neighborhoods

The University of Maine recently unveiled the world’s largest 3D printer said to be able to create entire neighborhoods. The machine is four times larger than a preceding model that was first tested in 2019. The older model was used to create a 600 sf single-family home made of recyclable wood fiber and bio-resin materials.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021