Remove 2016 Remove Commissioning Remove Leases Remove Regulation
article thumbnail

Green Building Data Risk as an Opportunity

Green Building Law Update

The European Union has gone in another direction with the 2016 General Data Protection Regulation , applicable as of May 2018, updating and modernizing the principles enshrined in the 1995 Data Protection Directive which guarantee individual privacy rights in one’s personal data including “the right to be forgotten.”

Green 120
article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

which for the first time requires “for individual leased, rented, or other tenant or subtenant space within any building totaling in excess of 50,000 ft2 (5000 m2), separate submeters shall be provided.”. The reworked provisions for construction and plans for operation , now combined in chapter 10, are much more than systems commissioning.

Green 156
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

2018 IgCC – A Fast Paced Deep Dive

Green Building Law Update

which for the first time requires “for individual leased, rented, or other tenant or subtenant space within any building totaling in excess of 50,000 ft2 (5000 m2), separate submeters shall be provided.”. The reworked provisions for construction and plans for operation , now combined in chapter 10, are much more than systems commissioning.

Green 136
article thumbnail

BUSINESS REPORT: Texas – Innovation Moves Front And Center In Austin

Buisness Facilities Contributed Content

“The facility is being designed according to the most stringent environmental and safety standards, with the implementation of control technologies that will reduce our emissions footprint and exceed state and federal regulations.” The new facility is expected to begin operations in 2016. Perry said.

Austin 73
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. To receive an abatement for property taxes, a project must meet certain qualifications and follow certain procedures, as determined by law and regulation. Pollution control equipment.

Income 108
article thumbnail

LOCATION FOCUS: California Dreamin’ – A Rebound Fueled By New Energy

Buisness Facilities Contributed Content

The federal Bureau of Land Management, which has subsurface mineral rights for much of the Monterey shale field, in December sold about 15 leases for thousands of acres of potential shale development in California. It is anticipated that the Draft EIR will be brought before the Planning Commission for certification in March 2013.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

The developer, Houston-based Clean Line Energy, is awaiting approval from regulators in Iowa and Illinois before going ahead with the direct current line. At OPPD we will be at 15 percent renewable energy by July and we will be at 30 percent renewable energy by December 2016,” said Mueller. These three new projects amount to over $1.25