Remove Agreement Remove Austin Remove Negotiation Remove Office
article thumbnail

How To Survive The Marketing Department of One

Help Everybody Everyday

One instance was as the sole marketer at a small firm, the other was as the sole marketer for a branch office of a large firm. Branch Office Of A Large Firm. The first instance was a 60-person branch office of a 1,000-person firm, providing full-service engineering, surveying, planning and landscape architecture. Small Firm.

article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

Inspired by New Urbanism design principles, the complex will include an office building that will house the new IBM Services Center, as well as a separate, 11-story residential building with 95 river-view apartments and nine separate town homes. million office building will be funded by the State of Louisiana ($14.8

Metro 110
article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

These costs include such things as office space, office staff, operating facilites, etc. Example: 223 in Boston / 187 in Austin = 1.19. To adjust a known cost in Austin to that in Boston, multiply the Austin cost by 1.19. G General & Administrative Costs - the costs of operating a construction business.