Remove Airports Remove Documentation Remove Inspections Remove Safety
article thumbnail

Building Hong Kong's Airport

The Constructor

The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 Land reclamation for the airport added nearly 1% to the entirety of Hong Kong’s surface area. The project is the most expensive airport project ever, according to Guinness World Records. kmĀ² platform.

Airports 203
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. General inspection: Usual inspection of representative parts of a structure.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Safety Hazard on Construction Projects

The Constructor

This leads to the presentation of an Information Technology IT tool for construction project safety management Total-Safety and, in particular, a module within Total-Safety designed to help construction personnel develop method statements with improved levels of hazard identification.

Safety 114
article thumbnail

Damage Control: 5 Ways to Manage Construction Mistakes

Autodesk Construction Cloud

Silver Line Metrorail project leading to the Dulles International Airport. Sometimes, the project won’t pass inspection, or it will need to be torn down due to safety and health concerns. 2: Thoroughly Document Mistakes. If possible, make sure to document the mistake visually with photos.

article thumbnail

Subways in America

The Constructor

RECOMMENDED FOR YOU Building Hong Kong’s Airport Close Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT? All rights reserved.

America 203
article thumbnail

PRE-CONCRETE CHECKS FOR FORMWORK & RELEASE AGENTS

The Constructor

Depending on how big or complicated the pour is, the inspection may just take few minutes or it could take hours. Only when the formwork has been approved, may the pour take place. Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT?

Concrete 235
article thumbnail

The Top Sessions for Project Managers at AU 2023

Autodesk Construction Cloud

When it comes to Autodesk Build, there are easy choices to make that will save your teams time and centralize documentation so everyone who needs access has it. Weā€™ll tackle how simple modifications to daily reports, smart PDFs, and safety inspection forms will help customize your checklist experience and simplify your workflows.