article thumbnail

Building Hong Kong's Airport

The Constructor

The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 Land reclamation for the airport added nearly 1% to the entirety of Hong Kong’s surface area. The project is the most expensive airport project ever, according to Guinness World Records. kmĀ² platform.

Airports 203
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

For example, GAO and other studies/reports consistently report that errors and lack of due diligence with respect to original construction cost estimates are primary reasons for negative cost and schedule impacts, and overall poor project performance and outcomes. T The following figure, for example, was produced in 1972.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Top Ten Construction Projects in World

Construction Cost Estimating

These projects not only take up huge ground area, but they are also gigantic in scope, manpower and resource usage, economic and geographical impact, and they take quite some time to build. While the construction has been scheduled to finish in 2018, it has been delayed indefinitely.

article thumbnail

11 Ways to Improve Construction Business & Project Outcomes at AU 23

Autodesk Construction Cloud

Pack Your Bags: Progress Tracking Has Moved Business Intelligence Within Autodesk Products Done the Disney Way Making your construction schedule actionable Tracking Field Production with Assemble System and Power BI Reduce Safety Incidents A centralized construction safety software platform enables everyone to be a safety champion.

article thumbnail

Achieving project success through product and material testing

Construction Specifier

The construction industry faces a myriad of challenges, such as completing projects on schedule, ensuring the quality and safety of products and materials, overseeing the costs so they do not exceed the budget, and complying with corporate environmental and social responsibility standards; all while applying effective risk management at every step.

article thumbnail

Meet Canvas, the Drywall Finishing Robot Offering Level 5 Quality

Construction Junkie

The robot not only provides consistency to the finish application, but the programming can be altered to speed up or slow down, depending on what the schedule allows. It also features an on-board dust collection system and sanding arm to reduce cleanup on-site.

article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

In this phase you assemble your team and assign tasks to individuals, develop a budget for the project, develop a schedule and create a communications plan. It is kept in the mind that during the execution of the project, it is required to keep the process monitored for timely completion of the project, as per schedules.