Remove Architecture Remove Roads Remove US Remove Zoning
article thumbnail

Important Factors to Consider When Building a New Home

CivilJungle

So when we want to build a new home, we also have to consider all our needs related to home and comfort zone. In ready-made design, the homeowner gauges the process by seeing building photos of different building materials and architectural sites and checking the procedures. Understanding Your Own Unique Needs. Lighting And Automation.

article thumbnail

CONSTRUCTION SITE PLANNING

The Constructor

Site planning is the art of arranging structures on the land and shaping the spaces between, an art linked to architecture, engineering, landscape architecture, and city planning. Site planning in architecture and landscape architecture refers to the organizational stage of the landscape design process.

Site 118
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Restart Roulette & Taking Revit Server On the Road - Do Revit

Do

My journal of work in Revit as part of a 600+ member architecture firm. Restart Roulette & Taking Revit Server On the Road. As I mentioned in my previous post " Taking Revit Server Off-Road " the first concern is that you cant simply shut down Revit Server and everything will be all-right. See us @ RTC NA 12. Newer Post.

Revit 48
article thumbnail

EXPOSURE CONDITIONS AFFECTING DURABILITY OF CONCRETE

The Constructor

5 Extreme Concrete in contact with or buried under aggressive sub-soil / ground water, surface of members in tidal zone, members in direct contact with liquid / solid aggressive chemicals. No Environment Exposure Conditions 1 Mild Concrete surfaces protected against weather or aggressive conditions, except those situated in coastal area.

Concrete 181
article thumbnail

EARTHQUAKE MAGNITUDE AND ENERGEY RELEASED

The Constructor

Related posts: MAGNITUDE & INTENSITY OF EARTHQUAKE EARTHQUAKE GEOTECHNICAL ENGINEERING AND ITS PRACTICES-III-EARTHQUAKE DESTRUCTION How can it be in Seismic zone but not in earthquake zone or near earthquake fault? releases 1000 times more energy than the earthquake of magnitude of 6.2 and 32 times more than the magnitude of 7.2.

Concrete 104
article thumbnail

Bridging the Future of Construction: A Spotlight on 6 Young Changemakers 

Autodesk Construction Cloud

Wootton High School, Rockville, MD Tell us about your submission. However, despite expectations, there’s not a single road connecting the two islands. It took us 25 minutes. Every building you design is not only just a practical place for people to stay, but it also is an art piece that connects us no matter who you are.

article thumbnail

Monorail Train In India

The Constructor

Related posts: SEISMIC ZONES IN INDIA Social Impacts of Large Dams in India in india if you a lease a land and do some land levelling (soil improvement) which expenditure will it be? Monorail project in Mumbai also has been inaugurated on Feb 10, 2009. All rights reserved.

Concrete 113