article thumbnail

Auto Draft

FDR Safety

Finding safeguards for a specific task is challenging because a physical guard may not be feasible. This article is intended to introduce you to a long-accepted concept recognized in OSHA and ANSI standards but is not well known or understood. A feasibility assessment usually takes less than an hour.

Drafting 156
article thumbnail

Fraudulent Concealment Subject to Statutory Limitations Period

Construction Lawyer

The letter stated in part: “The owner should consider the fact that there is no economically feasible corrective action (such as filling the mine void) that can be taken to guarantee against future subsidence. The court ended with the admonishment that it was not ruling on whether the accrual provision found at Article 1.3.7.3

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

The SC General Assembly has set aside $300 million to cover the project’s entire construction cost, if needed, and the federal dollars needed to complete the feasibility study have been allocated, meaning that the project is proceeding with no funding or staff resource constraints. The project must then be presented to U.S. Johns River.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

SGICC will use the bulk of the D2PA funds to provide grants to PA-based small companies to demonstrate the feasibility of emerging technologies, or seed funds to test and help launch ideas, and to assist in market acceptance and growth of shale energy focused products or services. 26, 2013 Deseret news article. “It Mid Atlantic U.S.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Energy Innovations Small Grant (EISG) Program: Provides up to $95,000 for hardware projects and $50,000 for modeling projects to small businesses, non-profits, individuals and academic institutions to conduct research that establishes the feasibility of new, innovative energy concepts. ” For more information, please visit this link.

Income 108
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Verify ground system is in compliance with ANSI/NFPA 70 National Electrical Code, Article 250 3. When feasible the position of valves, air pressure, temperature, or water level being monitored should be altered to actuate the signals. Draft regulators require slightly negative pressure in the combustion chamber at maximum input.