Remove Bidding Remove Change Orders Remove CSI Remove Subcontracting
article thumbnail

Controlling Construction Costs, Rocket Science, and Time Travel

Job Order Contracting

Using these granular elements and sharing the associated descriptions, l abor, material, and equipement details in a standardized format (CSI MasterFormat) with all project participants within a robust collaborative process is the path to significant cost savings and the mitigation of change orders, disputes, and waste.

Travel 178
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat was produced as a “first edition” in 1978 by Construction Specifications Canada and Construction Specifications Institute (CSI). 00 11 13 Advertisement for Bids. 00 11 16 Invitation to Bid. 00 24 13 Scopes of Bids. Scopes of Bids (Multiple Contracts). Scopes of Bids (Multiple-Prime Contract).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat was produced as a “first edition” in 1978 by Construction Specifications Canada and Construction Specifications Institute (CSI). 00 11 13 Advertisement for Bids. 00 11 16 Invitation to Bid. 00 24 13 Scopes of Bids. Scopes of Bids (Multiple Contracts). Scopes of Bids (Multiple-Prime Contract).