Remove Bidding Remove Change Orders Remove Document Remove Subcontracting
article thumbnail

Controlling Construction Costs, Rocket Science, and Time Travel

Job Order Contracting

Using these granular elements and sharing the associated descriptions, l abor, material, and equipement details in a standardized format (CSI MasterFormat) with all project participants within a robust collaborative process is the path to significant cost savings and the mitigation of change orders, disputes, and waste.

Travel 177
article thumbnail

IDIQ Construction Contract Guide

Job Order Contracting

No ability to subcontract—limited to trade specified in the contract. Prequalified shortlist of contractors that bid on multiple projects. Similar to traditional design-bid-build thus no additional training or enhanced skills required. Streamlines post-bidding award, security clearances, etc. T and M Disadvantages.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Digital Builder Podcast Ep 22: How Specialty Contractors Can Navigate Contracts & Get Paid On Time

Autodesk Construction Cloud

In reality, it’s often a monster document packed full of legalese that can be difficult to understand. Best practices for handling change orders. A contract should really be a tool to help everyone in the construction industry; it doesn’t have to be this monster document that you just hold your nose, sign, and hope for the best.”

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

A Job Order Contract Execution Guide is a required element for any successful, best management practice JOC Program. The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. the time of award.

Contract 100
article thumbnail

Construction Forms for excel

Construction Cost Estimating

The package of over 140 purpose built forms are customizable Excel templates and documents addressing all areas of construction contract work. Construction Forms screenshot Construction Forms for Excel are designed to facilitate contracting and administrative tasks for construction work and projects.

Lien 45
article thumbnail

#108:  Replacement Contractor Issues

NH Construction Law

At the bid stage, even with the original plans and specs and any change orders or updated drawings in hand, the completion contractor won’t be able to spot every potential error in the existing work, and so will pad his bid – or insist on a cost-plus arrangement – to protect himself against unseen issues.

article thumbnail

Litigation Topics for Prime / Subcontractor Contracts

Construction Law Monitor

The information is very helpful to contractors and can be used a resource when a contractor begins the contracting phase of a construction project to help get a better understanding of what is going on within the contract documents. Commonly litigated subcontract provisions. Change Order and Extra Work Provisions.