The Business of Construction Risk Management » The Fundamentals of Building Information Modeling (BIM). Building Information Modeling (BIM) is no different. Before jumping into BIM with both feet, let’s work on some fundamentals. BIM changes that and even more. BIM is also a process. I love basketball.

article thumbnail

4 No-Brainer Workflows with Autodesk Construction Cloud Connect 

Autodesk Construction Cloud

Fortunately, you can overcome these hurdles by using ACC Connect to sync drawings, field reports, and documents in the cloud. Using ACC Connect, you can integrate files and create custom workflows between SharePoint and Autodesk Build, Autodesk Docs, BIM 360, or PlanGrid. . 2: Project Management. 3: Contract Management.

Autodesk 105
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM for Reinforced Concrete – Rebar clash prevention

BIM & Beam

This article is the continuation of a conversation that I started with the blog post depicting the value of BIM for Concrete and continued with from 2D to 3D with rebar detailing. When a clash is detected, an intervention (change order) is typically sent to detailers as the finding still comes late in the design to construction process.

BIM 47
article thumbnail

Ultimate Guide to Construction Submittals [Template]

Autodesk Construction Cloud

The submittal log includes information provided to the architect asking for approval for certain materials and equipment before they’re fabricated and sent to the project site. Construction submittals may include thousands of line items such as color charts, material data, samples, color and finish selections, shop drawings, and more.

article thumbnail

40 Under 40: Champions of Construction 2021

Autodesk Construction Cloud

Senior BIM Manager. Regarded as a pioneer of BIM technology at Amazon, Nima Jafari currently serves as the company’s Regional Senior BIM Manager, where he’s building the Emerging Technologies Department in Amazon TES from the ground up. Nima is no stranger to BIM. VDC/BIM Manager. Nima Jafari. Justin Maryak.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 63 36 Field Order Form. 00 63 46 Construction Change Directive Form. 00 63 49 Work Change Directive Form. 00 63 57 Change Order Request Form. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 63 36 Field Order Form. 00 63 46 Construction Change Directive Form. 00 63 49 Work Change Directive Form. 00 63 57 Change Order Request Form. Requirements.