REINFORCEMENT COVER AND PRE-CONCRETE CHECKS
The Constructor
MARCH 20, 2012
From the diagram above, we can see how the process unfolds. When the formwork is erected the concrete can be poured. When the concrete has reached the required strength the formwork can be poured. The cover blocks have ensured that the steel has sufficient protection from the elements.
Let's personalize your content