REINFORCEMENT COVER AND PRE-CONCRETE CHECKS
The Constructor
MARCH 20, 2012
When the formwork is erected the concrete can be poured. When the concrete has reached the required strength the formwork can be poured. From the diagram above, we can see how the process unfolds. When the binding has set, the steel bars are placed into position.