Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

The J OCPB (JOC Price Book: reflects the current local costs in detail for construction tasks expected to be performed in the geographical area of the base contract with the primary use of developing a detailed line-item price. This is a national average cost book that DOES NOT REFLECT LOCAL COSTS. 5117.9001 Definitions.

Contract 228
article thumbnail

Setting up a Job Order Contract Using Best Management Practices

Job Order Contracting

“Coefficient” – a numerical factor that represents costs (generally indirect costs) not considered to be included in the “Unit Price Book” (UPB) unit prices (e.g., d) An indefinite-delivery, indefinite-quantity (task order) contract which provides for the use of negotiated, definitive, bilateral orders (i.e.,

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contract / Job Order Contracting – JOC: Do’s – Don’ts

Job Order Contracting

Build your knowledge of line item estimating with the JOC Unit Price Book. Verify line items, quantities, and coefficient(s) of internal Owner estimates and Contractor estimates. Follow Job Order Contract requirements with respect to bonding and overhead related costs. Use”open book”, or “street pricing”. (If

Contract 100
article thumbnail

Job Order Contract – Frequently Asked Questions

Job Order Contracting

Required software, Unit Price Book, other “tools”, and training etc. What is a Unit Price Book? Job Order Contracts require a unit price book, UPB. Job Order Contracts require a unit price book, UPB. What are the characteristics of a “good” unit price book?

Contract 100
article thumbnail

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders.

Job Order Contracting

No contractor and limited A/E assistance with detailed estimating, plan checking, and constructability reviews during design phase. Bid shopping can occur and actual overhead and profit amounts are unknown. Agency CM can provide industry experience and estimating, scheduling, and project management expertise for the owner’s benefit.

Design 130
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The JOC Contract shall use the current calendar year issue of locally researched unit price cost data equivalent to the OpenJOC(TM) Unit Price Book – UPB (subsequently referred to as UPB) with updates as applicable, as a basis for unit cost. coefficient (reference table of allowable overhead). authorization. x 1.01 = $15.15).

Contract 100
article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. This total or subtotal is usually identified as such in an estimate report. Also known as Total Estimated Contract Cost (TECC).