Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

The J OCPB (JOC Price Book: reflects the current local costs in detail for construction tasks expected to be performed in the geographical area of the base contract with the primary use of developing a detailed line-item price. This is a national average cost book that DOES NOT REFLECT LOCAL COSTS. 5117.9001 Definitions.

Contract 227
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The JOC Contract shall use the current calendar year issue of locally researched unit price cost data equivalent to the OpenJOC(TM) Unit Price Book – UPB (subsequently referred to as UPB) with updates as applicable, as a basis for unit cost. coefficient (reference table of allowable overhead). authorization. Job Conditions.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Setting up a Job Order Contract Using Best Management Practices

Job Order Contracting

“Coefficient” – a numerical factor that represents costs (generally indirect costs) not considered to be included in the “Unit Price Book” (UPB) unit prices (e.g., The coefficient(s) proposed by the offeror and accepted by the Owner are incorporated in the JOC. JOC Characteristics. (a)

Contract 100
article thumbnail

Best Practice Job Order Contracting

Job Order Contracting

“Coefficient” means a numerical factor that represents costs (generally indirect costs) not considered to be included in “Unit Price Book” unit prices (e.g., Coefficients proposed by offerors are multiplied times the unit prices in the Unit Price Book to price a job or project on individual orders. Best Practice Job Order Contracting.

Contract 100
article thumbnail

Is Your Accountant Helping Or Hurting Your Construction Company?

Contractor Bookkeeping

Inland Marine Insurance. Overhead & Profit Charges. The traveling bookkeeper would make the final entries in the ledgers and journals and review everything to make certain it all totaled up correctly to be sure the books were in balance. Underground. Charge Backs. Retention Held. Retention Billed. Balloon Framing.

article thumbnail

Job Order Contracting – JOC – DOD – AFARS

Building Information Management

“Coefficient” means a numerical factor that represents costs (generally indirect costs) not considered to be included in “Unit Price Book” unit prices (e.g., Coefficients proposed by offerors are multiplied times the unit prices in the Unit Price Book to price a job or project on individual orders. 5117.9003 Use of job order contracts.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Application: This standard applies to warehouse or large overhead rolling doors. Inspect gear box, change or add oil as required. Tool Group A.