Remove Budget Remove Change Orders Remove Life Cycle Remove Modeling
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste.

article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

Even though the majority of costs (approximately 80% of total life-cycle costs) occur during the operational and maintenance (O&M) phase, decision-making is largely made based upon lowest bidder versus best value as well as current year impacts versus multi-year considerations. Job Order Contracting. The Benefits .

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why the BIM Revolution Fizzled

Job Order Contracting

The primary challenges facing the AECOO sector are due to lack of owner leadership and competency… The adoption of BIM as a tool to efficiently manage the life-cycle of built structures requires a full understanding of LEAN collaborative processes as they apply to asset total cost of ownership. The buck stops with owners.

BIM 100
article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

The way to deliver 96%+ of renovation, repair, and maintenance projects on-time, on-budget, and at the appropriate level of quality is to enable collaboration with contractors and other expert service providers. – 2016, Arizona State University – Job Order Contracting Performance Survey-2015.

article thumbnail

Integrated project delivery method

Job Order Contracting

These benefits are largely derived through the use of a common data environment, CDE, which dramatically improves communication and collaboration throughout the project life-cycle. A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. .

article thumbnail

The Myth of Facility Management Outsourcing

Building Information Management

Sure, its true that many owners lack the education, skills, and capability to consistently execute efficient life-cycle management across their building portfolio, many service providers are in the same position. 90%+ Project On-time & On-Budget. 90%+ Project On-time & On-Budget. Significantly Fewer Change Orders.

article thumbnail

OpenJOC – LEAN Construction Delivery / Job Order Contracting

Job Order Contracting

OpenJOC leverages processes, standardized cost data , and technology to drive win-win relationships among all project participants and on-time, on-budget, quality construction outcomes. ASSET LIFE-CYCLE MODEL – Total Cost of Ownership Management. Key characteristics of OpenJOC. Outcome-driven. Process-based.

Contract 100