Remove Budget Remove Contract Remove CSI Remove Documentation
article thumbnail

The ONLY Cost Effective Job Order Contracting Solution that maintains current local cost data

Job Order Contracting

If you are looking a Job Order Contracting Solution that is cost effective and maintains current local cost data, you are in the right place.

Contract 189
article thumbnail

Considering a Job Order Contract?

Job Order Contracting

Here are a few items for review when organizations are considering a job order contract or hoping to improve one. Contracts and individual Projects/Work Orders within JOC should have established dollar limits. The approved JOC unit price book should be locally researched and organized using CSI Masterformat.

Contract 206
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

LEAN Job Order Contracting

Job Order Contracting

LEAN Job Order Contracting (JOC) is a robust integrated project delivery process for repair, renovation, maintenance, sustainability, and “minor” new construction. LEAN JOC integrated People, Process, Information, and collaborative Technology to consistently yield quality projects on-time and on-budget. INTRODUCTION.

Contract 165
article thumbnail

Job Order Contracting – The LEAN Way!

Job Order Contracting

LEAN Construction Delivery (repair, renovation, maintenance, sustainability, new construction) consistently drives quality, on-time, and on-budget outcomes.Exclusively available LEAN Construction Delivery Framework via the 4BT OpenJOC Solution(TM). The post Job Order Contracting – The LEAN Way! A fixed priced, lump sum projects.

Contract 100
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

GAO, 2009 The associated processes for developing a credible construction cost estimate are equally well documented. “Despite the fact that these basic characteristics have been published and known for decades, we find that many agencies still lack the ability to develop cost estimates that can satisfy them”. –

article thumbnail

Controlling Construction Costs, Rocket Science, and Time Travel

Job Order Contracting

Consistently delivering quality projects on time and on budget simply requires leadership, accountability, and commitment. Owner and design-builds therefore develop and maintain consistently formated documentation as an expectation from the outset of project conceptualization through plannig, procurement, and project delivery and beyond.

Travel 178
article thumbnail

Job Order Contracting LEAN Construction Technology

Job Order Contracting

If your are setting up a JOC Program, or wish to improve an existing Job Order Contract, the 4BT-CE OpenJOC Solution provides the open, best-value alternative. Detailed line item construction cost estimating, as well as program, project, and document management. CSI Masterformat (TM) UPB format (50 Division) for data organization.

Contract 100