Remove carpet-area-built-up-area-super-built-up-area
article thumbnail

What is Carpet Area | Built-Up Area | Super-Built-Up Area & Plinth Area with Calculation, Formula & Differences

Learn Civil Engineering

What is a Carpet Area? The carpet area is the area between wall to wall. A carpet area can be simply understood as the area in a room or hall on which a carpet can be […]. Here the thickness of the wall doesn’t include because as mentioned it is the distance between wall to wall.

article thumbnail

Plinth Area Meaning | Plinth Area Definition | What Is Plinth Area | Plinth Area Rate | Plinth Area Estimate | How to Calculate Plinth Area of a Flat

CivilJungle

Plinth Area Meaning: The plinth area means we know the built-up covered area at the floor level of the basement or of any story. The plinth area is also referred to as the total area captured by the building along with the interior or exterior wall and also known as the built-up area.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Variations among Plinth Area and Carpet Area

Construction Cost Estimating

In this construction video tutorial, you will come to know the variation among carpet area and plinth area as well as types of area included and excluded in carpet and plinth area. Carpet area means the actual utilized area of a building. Floor area is similar to carpet area.

IDEA 40
article thumbnail

What Is Superstructures | Difference Between Load-Bearing and Framed Structures

CivilJungle

The portion above the ground floor level is known as super-structure. In this article types of super-structures based on the method of load, a transfer is first presented and then the various components are discussed giving their functions and types. Types of Super Structures. 2 Suitable up to three stories.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Industrial Revenue Bonds: May be used as long-term financing of up to 100% of a project for: Acquisition of land, buildings, site preparation and improvements; Construction of buildings; Acquisition and installation of furnishings, fixtures and equipment; Capitalizable soft costs (e.g.,

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ENTERPRISE ZONE CREDIT: To stimulate growth in depressed areas of the state, Alabama offers certain tax credit incentives to business that locate or expand within a designated enterprise zone. Terms for both are normally 10-20 years and can finance up to 100 percent of the project costs.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 01 55 19 Temporary Parking Areas. 01 55 29 Staging Areas. 03 47 13 Tilt-Up Concrete.