article thumbnail

New Maryland Real Estate Laws from the 2020 Legislative Session

Green Building Law Update

Ground Leases. The General Assembly passed several bills relating to ground leases during the 2020 legislative session. The redemption or extinguishment of the ground rent is effective to conclusively vest a fee simple title in the ground lease tenant when the ground lease tenant records the certificate in the county land records.

Maryland 227
article thumbnail

LEED Commercial Interiors can Save the Planet

Green Building Law Update

The CI v4 EAc1: Enhanced Commissioning credit goes farther than the fundamental commissioning incorporating changes from the v4 prerequisite that make this credit more advantageous and less first dollar cost intensive than in v 2009. Be aware that building envelope commissioning is now included in this credit.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

which for the first time requires “for individual leased, rented, or other tenant or subtenant space within any building totaling in excess of 50,000 ft2 (5000 m2), separate submeters shall be provided.”. The reworked provisions for construction and plans for operation , now combined in chapter 10, are much more than systems commissioning.

Green 156
article thumbnail

M&V, MBCx, WTF: Building Performance Monitoring as a Means to Achieve Decarbonization Goals

Stok

In the built environment, quality assurance and control processes like measurement and verification (M&V) and monitoring-based commissioning (MBCx) require real-time, accurate data and provide insights that are foundational to achieving zero carbon targets.

article thumbnail

AEE WEST 2023: Building Performance Monitoring

Stok

In the built environment, quality assurance and control processes like measurement and verification (M&V) and monitoring-based commissioning (MBCx) require real-time, accurate data and provide insights that are foundational to achieving zero carbon targets.

article thumbnail

2018 IgCC – A Fast Paced Deep Dive

Green Building Law Update

which for the first time requires “for individual leased, rented, or other tenant or subtenant space within any building totaling in excess of 50,000 ft2 (5000 m2), separate submeters shall be provided.”. The reworked provisions for construction and plans for operation , now combined in chapter 10, are much more than systems commissioning.

Green 136
article thumbnail

Venyu Solutions Opens Tier III Data Center In Shreveport

Business Facilities

Venyu Solutions LLC has completed its new Tier III data center – the highest certification for any data center in Louisiana – following the historically faithful $20 million preservation of the former Selber Bros. The Caddo Parish Commission sold the Selber Bros. Department Store, built 60 years ago in downtown Shreveport.