Remove Certification Remove Documentation Remove Drafting Remove Green
article thumbnail

New Sustainable Projects Exhibit in 2017 AIA Contract Documents

Green Building Law Update

Last week the American Institute of Architects released the 2017 edition of the A201 family of contract documents, including updated versions of the AIA’s documents developed for the design-bid-build delivery model. The previous version of the design-bid-build contract documents included a Sustainable Project version.

article thumbnail

RELi Could be Standard Practice in Nearly Every Real Estate Transaction

Green Building Law Update

The Green Business Certification Inc.’s Much more than only anticipating weather extremes, in the draft document expected to be approved in the coming days, RELi 2.0 Much more than only anticipating weather extremes, in the draft document expected to be approved in the coming days, RELi 2.0 Of note, RELi 2.0

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Essential BIM Terminology

Viewpoint Construction Technology

Level 0 : Level 0 entails basically no collaboration, and only 2D CAD drafting is used. Level 1 : Level 1 BIM is a combination of 3D CAD and 2D for drafting. Data and documents are shared via a common data environment. Each stakeholder or contractor maintains their own data and documents. BIM Execution Plan.

BIM 174
article thumbnail

Litigation over First LEED Platinum Building Comes to an End

Green Building Law Update

SmithGroup’s ‘green’ design called for exposed structural wood members outside the envelope of the Merrill Center, including some that penetrated the building’s façade. to apply the PolyClear 2000 treatment, and Permapost provided certificates to Weyerhaeuser verifying that the treatment had occurred.

Liability 120
article thumbnail

Litigation over First LEED Platinum Building Comes to an End

Green Building Law Update

SmithGroup’s ‘green’ design called for exposed structural wood members outside the envelope of the Merrill Center, including some that penetrated the building’s façade. to apply the PolyClear 2000 treatment, and Permapost provided certificates to Weyerhaeuser verifying that the treatment had occurred.

Liability 120
article thumbnail

The Second Best Way to Mitigate Your Risk in Green Building

Green Building Law Update

The best way to mitigate risk in your green building project are properly drafted contract documents prepared by this law firm or by another attorney with green building experience. As I posted in this blog less than a year ago, Less than 20% of Green Building Contracts are Properly Drafted.

Green 153
article thumbnail

You Need a Green Building Consultant (Who Speaks for the Trees)

Green Building Law Update

We are often asked “what is the best way to assure success in a green building project?”. Whether that query is from a Fortune 1000 businesses or an architect, the answer is the same, have the owner engage an experienced green building consultant as early as possible in the project.