Remove Certification Remove DOT Remove Inspections Remove Permits
article thumbnail

No Free Warranty: Connecticut Court Adopts Correction or Repair Test

Constructlaw

ALS began performing invasive species removal and control work for a Connecticut Department of Transportation (DOT) intersection improvement project in February 2018. Travelers Casualty & Surety Company of America (Travelers) issued the payment bond for the project. ALS completed its removal work in August 2018.

article thumbnail

Demystifying fire-retardant treated wood specifications

Construction Specifier

Warranties for FRTW are manufacturer-specific and must be submitted by the authorized company official indicating the FRTW is manufactured under independent third-party follow-up inspection and that it meets or exceeds the code requirements for FRTW. It is subject to third-party inspection and quality assurance. Part 2: Products.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect general arrangement of door and mechanism, mountings, standards, wind locks, anchor bolts, counterbalances, weather stripping, door sweeps etc.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

If applying for a transferable credit certificate, no more than half the credit may be applied in a single calendar year. The business must obtain a direct-pay sales and use tax permit from the State of Arkansas. Expedited permitting; comprehensive plan amendments). ” For more information, please visit this link.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The capital credit is used only after all other deductions, losses or credits permitted under Titles 40 and 41 of the Code of Alabama 1975. The business must obtain a direct-pay sales and use tax permit from the State of Arkansas. GA companies can implement Work Ready two ways—through job profiling and Work Ready Certificates.

Income 75