Remove Certification Remove Drafting Remove Leases Remove Regulation
article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

The drafting process was widely criticized resulting in a document that has never been enacted anywhere, and likely should not ever be adopted as code. indoor environmental quality survey to be administered 18 months after issuance of a certificate of occupancy and repeated every 3 years. Sec 901.4.1.4.

Green 156
article thumbnail

2018 IgCC – A Fast Paced Deep Dive

Green Building Law Update

which for the first time requires “for individual leased, rented, or other tenant or subtenant space within any building totaling in excess of 50,000 ft2 (5000 m2), separate submeters shall be provided.”. indoor environmental quality survey to be administered 18 months after issuance of a certificate of occupancy and repeated every 3 years.

Green 136
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Check throw regulator and spring assembly for tightness. Check operation of all relays, pilot valves, and pressure regulators. Verify correct main line pressure leaving the main line air regulator. If the pressure is not correct adjust or repair the regulator 3. Replace washers and/or “o” rings if required. Electrolyte.

article thumbnail

LOCATION FOCUS: California Dreamin’ – A Rebound Fueled By New Energy

Buisness Facilities Contributed Content

The federal Bureau of Land Management, which has subsurface mineral rights for much of the Monterey shale field, in December sold about 15 leases for thousands of acres of potential shale development in California. It is anticipated that the Draft EIR will be brought before the Planning Commission for certification in March 2013.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. To receive an abatement for property taxes, a project must meet certain qualifications and follow certain procedures, as determined by law and regulation. Pollution control equipment.

Income 108