Remove Certification Remove Fabrication Remove Inspections Remove Permits
article thumbnail

In Construction, There’s A Tattletale And There’s What is Right

Best Practices Construction Law

Waukegan Steel, LLC , an employee brought a False Claims Act (FCA) against his employer for false billing and certification on a goverment project. Waukegan was responsible for fabricating and installing the structural steel of project. According to the employee, Waukegan did not have any of these certificates. 3730(b).

Claims 63
article thumbnail

Demystifying fire-retardant treated wood specifications

Construction Specifier

Warranties for FRTW are manufacturer-specific and must be submitted by the authorized company official indicating the FRTW is manufactured under independent third-party follow-up inspection and that it meets or exceeds the code requirements for FRTW. It is subject to third-party inspection and quality assurance. Part 2: Products.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

7 Best Hard Hat Suspension to Protect Your Head

Work Gearz

Suspension and a frontal Terry Fabric Sweatband. This cap also permits accessories such as earmuffs or other customized preferences. Swing ratchet suspensions utilize a reversible ratchet to permit you to self-adjust your hat’s fit. This would probably void the hat’s safety certification. Honeywell Fibre-Metal Hard Hat.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

equipment, and fabricating items customary to the trade, etc., In off-site work such as off-site fabrication, the ORGANIZATION NAME shall be so notified at the time of the issuance of the JO by the Contractor. The ORGANIZATION NAME reserves the right to inspect such off-site work at any time. (6) Field Office Expense.

Contract 100
article thumbnail

WorkSafe BC Directors Approve OHS Amendments

Safety Services Company

permitting a certified utility arborist (CUA) to come closer than the Column B limits in Table 19-3 when passing the bucket and boom of an insulated aerial device between energized high voltage conductors and the system neutral conductor. Summary- The revision creates a new section 19.34.1 Summary- There are 6 changes made to part 13.

Safety 49
article thumbnail

Advanced Manufacturing: Manufacturing Gets Smarter, Faster

Business Facilities

While a wealth of industries and companies are adding advanced manufacturing jobs in Kentucky—including healthcare products and pharmaceutical production, factory robotics systems fabrication and integration, aerospace composites, chemicals engineering and production to name a few—none is growing as fast as aluminum.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 05 Certifications Page. 00 31 43 Permit Application. 00 31 46 Permits. 00 45 00 Representations and Certifications. 00 45 26 Workers Compensation Certificate Schedule. 00 45 46 Governmental Certifications. 00 01 05 Certifications Page. 00 31 43 Permit Application. 00 31 46 Permits.