Remove Change Orders Remove Comparison Remove Environment Remove Life Cycle
article thumbnail

Demand For Efficient Life-Cycle Building Management Processes – BIM, JOC, IPD – FIATECH PRESENTATION – 2012

Building Information Management

Field specific variables, such as weather, on-going operations, soils conditions, security, safety, site lay-out, environment protections and other contexts must be considered as well as the means and methods of work execution. A “FACEBOOK for Facilities Construction and Life-cycle Operations” is on the horizon.

article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

Educational and training programs must focus upon asset life-cycle management and modeling. Overall focus must shift from first-cost mentality to life-cycle/total-cost-of-ownership. Overall focus must shift from first-cost mentality to life-cycle/total-cost-of-ownership.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why the majority of CMMS System Implemenations Fail

Building Information Management

What good is a CMMS system into which an Owner inputs their own experiences without comparison to industry averages, best-practices, or any third party metrics? … The sad part is, there is a lot of information out there on efficient life-cycle management of the built environment supported by digital technology.

article thumbnail

CULTURE, TECHNOLOGY/SOCIAL MEDIA, & BIM

Building Information Management

Unproductive ad hoc processes traditionally associated with the design, construction and management of the built environment are being replaced by robust life-cycle management and efficient project delivery methods. management of the built environment are being replaced by robust life-cycle management and efficient project.

BIM 40
article thumbnail

Collaborative, Efficient Construction Delivery Methods – The Real Obstacle to BIM

Building Information Management

The Architecture, Engineering, Construction, Operations, Owner (AECOO) sector must engage in collaborative construction delivery methods in over achieve any measurable performance improvement in the life-cycle management of the built environment. Building Information Management, Model and Modeling.

BIM 58