Remove Change Orders Remove Document Remove Life Cycle Remove Software
article thumbnail

Integrated project delivery method

Job Order Contracting

These benefits are largely derived through the use of a common data environment, CDE, which dramatically improves communication and collaboration throughout the project life-cycle. A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. .

article thumbnail

OpenJOC – LEAN Construction Delivery / Job Order Contracting

Job Order Contracting

That said proper and well-defined relationships must be established, documented, and maintained from the day one, and a competent Owner with good leadership skills plays a vital role. In some cases, consultants are hired to assist in managing a Job Order Contract. ASSET LIFE-CYCLE MODEL – Total Cost of Ownership Management.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

5 Types of Subcontractor Software Transforming the Trades 

Autodesk Construction Cloud

They must coordinate some of the most complex aspects of the built environment, with ever up-to-date documents, or face the consequences. Today, we’re celebrating five game changing types of technology and software for subcontractors with a look at specific examples that get the job done faster. 1: Collaboration Software.

Software 105
article thumbnail

Behind the Build: Interview with Mike White, Director of Design and Construction at North Point Hospitality

Autodesk Construction Cloud

I also oversee the development life cycle, starting with due diligence, all the way up through the end of construction and through the warranty period. As construction evolves, how do you see the role of Director of Design and Construction changing? It's all in one place in terms of document management.

Design 80
article thumbnail

BIM and Cloud Computing – Get Beyond 3D Visualization and Focus Upon the “I”

Building Information Management

Both technologies also embed associated business process rules and components which will enable enhanced life-cycle management of the built environment, alignment of structures with organizational mission, and better consideration of general community impacts. Definition of BIM. . BIM can be applied at various levels.

BIM 78
article thumbnail

7 Construction Industry Truths Made Clear at Autodesk University

Autodesk Construction Cloud

The additional infrastructure needs or talent required to be successful in life-cycle data collection & analysis. How to’s for leveraging permissions for document control and security. Background into integrated methodologies for tracking changes and model coordination review. “We Josh Cheney, Sr.

article thumbnail

Built Environment Life-Management, BIM, LEAN, and Efficient Project Delivery

Building Information Management

Life-cycle Management 101. Construction delivery methods and their associated processes and contractual documents are directly linked to the success or failure of any project. BIM (Building Information Modeling) is the life-cycle management of the built environment supported by digital technology.

BIM 40