Remove Change Orders Remove Document Remove Software Remove Visualization
article thumbnail

What Is a Change Order?

Autodesk Construction Cloud

What Is a Construction Change Order? According to some estimates, an average of 35% of projects experience at least one major change throughout the life of the project. As a contractor, change orders can leave you feeling like you’re trapped between a rock and a hard place. Key Takeaways.

article thumbnail

Payment Applications 101: A Guide to Pay Apps in Construction

Fieldwire

But a pay app is actually a collection of supporting documents that first and second tier contractors submit to request payment. The construction contract will typically define the process for submitting a pay app, the documents to include, and the deadline for submission. Contractors get paid for the work they document.

Lien 98
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why It’s Time for Contractors to Adopt Collaborative BIM

Viewpoint Construction Technology

The JBKnowledge 2017 Construction Technology Report , which covers topics such as software adoption and IT investment, reveals some interesting—and perhaps a little troubling—insights about BIM. Accessible, version-controlled documents —BIM software solutions simplify data management and expand accessibility of documents to the entire team.

BIM 223
article thumbnail

Post River Software introduced Asphalt Pro mobile applications for asphalt contractors

Construction Cost Estimating

Post River Software introduced Asphalt Pro mobile applications. These may range from mix yield underrun/overrun calculators, tack and seal distance calculators & rate validators ; and visualizers to balance plant, truck, paver and roller capacities. The application also contains project documentation capabilities.

article thumbnail

New in Autodesk Construction Cloud: 50+ the Latest Product Releases

Autodesk Construction Cloud

This allows members to match font sizes on markups to the font sizes used on sheets and documents. . Both Autodesk Construction Cloud and BIM 360 users now have access to a gallery view of all Power BI templates for various tools or workflows including cost management, document management, assets, and more.

Autodesk 105
article thumbnail

4 No-Brainer Workflows with Autodesk Construction Cloud Connect 

Autodesk Construction Cloud

Project data often lives in different places—from cloud-based software and hard drives to spreadsheets and emails. Fortunately, you can overcome these hurdles by using ACC Connect to sync drawings, field reports, and documents in the cloud. The software makes progress tracking effortless, so you can ensure that teams stay on track.

Autodesk 105
article thumbnail

Building beyond boundaries: BIM and the data revolution in construction

Fieldwire

This not only hinders productivity but also increases the likelihood of errors, change orders, and delays during construction. There is also a need to overcome resistance to change within the industry. These platforms offer centralized hubs for real-time collaboration, document management, and workflow tracking.

BIM 52