Remove Change Orders Remove Documentation Remove Overhead Remove Visualization
article thumbnail

Data Scientists Reveal 5 Surprising Construction Insights to Manage RiskĀ 

Autodesk Construction Cloud

An example of a data point might be the number of overhead mechanical racks installed on the job that day, or logging the root cause of a safety incident. This information eventually translates into knowledge , like figuring out the average time it takes to install an overhead rack based on information collected from multiple jobs.

Risk 52
article thumbnail

Worldwide Need for Construction Collaboration

Building Information Management

BIM , however, is not the solution if the focus and/or requirement is associated with 3D visualization. Contract/Project/Document Management. Average project timeline. %/#/$ Change orders. Consolidation of procurement creates lower overhead cost and procurement cost. Consistent deployment. Enhanced productivity.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Cost Estimating Software vs. Spreadsheets ā€“ State of the Nation 2012

Building Information Management

While accurate, timely, and transparent cost estimating is critical to the success of any renovation, repair, sustainability, or new construction project, most construction cost estimators (over 55%) continue to rely primarily upon manual methods, hard copy documents, or electronic spreadsheets such as Microsoft Excel.

article thumbnail

What is Job Order Contacting ā€“ JOC ? Efficient Project Delivery Methods

Building Information Management

Advantages of Job Order Contracting – JOC – for OWNERS. fewer change orders, increased response to warranty issues, virtually no legal disputes. Advantages of Job Order Contracting – JOC – for CONTRACTOR. improved quality of project delivery and end results. overall project time savings.

article thumbnail

Sustainability of DOD Buildings ā€“ Reuse of Existing Buildings

Building Information Management

Consolidation of procurement – lower overhead cost and procurement cost. Virtual elimination of legal disputes, claims and mitigation of change orders. Contract, Project, Estimating, Document Management. Visual Estimating. Contractor and owner efficiencies in prosecution of the work.

article thumbnail

Sustainability of DOD Buildings ā€“ Reuse of Existing Buildings

Building Information Management

Consolidation of procurement – lower overhead cost and procurement cost. Virtual elimination of legal disputes, claims and mitigation of change orders. Contract, Project, Estimating, Document Management. Visual Estimating. Contractor and owner efficiencies in prosecution of the work.

article thumbnail

Every Owner Should Implement JOC ā€“ JOB ORDER CONTRACTING ā€“ for Renovation, Repair, Sustainabilty, and Maintenance Construction Projects

Building Information Management

The contracts price is put in terms of a coefficient, which is a multiplier that covers the contractor’s overhead and profit as well as any adjustment between the UPB and actual local prices. Reduced or Eliminated Change Orders. Greater Cost Visualization and Control. Reduced or Eliminated Claims. Research Results.