Remove Change Orders Remove Life Cycle Remove Software Remove Subcontracting
article thumbnail

5 Types of Subcontractor Software Transforming the Trades 

Autodesk Construction Cloud

Subcontracting is a time-honored tradition. Today, we’re celebrating five game changing types of technology and software for subcontractors with a look at specific examples that get the job done faster. 1: Collaboration Software. Collaboration software helps to preempt that risk of disconnect.

Software 105
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Subcontracts. Copies of the subcontractor proposals are to be a part of the Task Order submittal, and shall be included as backup. At the completion of the project, any savings associated with the Subcontract may be required to be passed along to the Order by way of a change order. Subcontract bid.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).