Remove Compensation Remove Documentation Remove Inspections Remove Permits
article thumbnail

September 2015 newsletter

FDR Safety

Require that contractors provide you with documentation of their safety performance and safety program. Documentation of their Experience Modification Rating, which measures Workers Compensation claims experience. Copies of all required permits and certifications. Review the documentation. Get their commitment.

Safety 120
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at. JOB ORDER CONTRACT (JOC) EXECUTION GUIDE. the time of award.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect general arrangement of door and mechanism, mountings, standards, wind locks, anchor bolts, counterbalances, weather stripping, door sweeps etc.

article thumbnail

Job Order Contracting Basic Definitions

Job Order Contracting

It includes several Contract Documents, including a JOC Operations Manual / JOC Program Execution Manual. The person or firm identified as such in the Agreement and is referred to throughout the Contract Documents, the will be providing the JOC Construction Services. CONTRACT / JOB ORDER CONTRACT. DEFECTIVE WORK. FINAL COMPLETION.

Contract 100
article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

The contractor is responsible for submitting documentation that substantiates the proposed approach. Typically, supporting documents are requested from the contractor. The latter compensates the contractor for the level of effort expended in estimating, designing, and negotiating the project order in advance of full funding.

article thumbnail

New Maryland Real Estate Laws from the 2020 Legislative Session

Green Building Law Update

The documentation submitted to SDAT must include a certified copy of the ground lease redemption deed that has been filed in the land records of the appropriate county. 32 and 33) establish similar authority for amendments to the declaration of a condominium and the governing documents of an HOA. House Bill 149 (Ch. Home Builders.

Maryland 227
article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

This interim document contains our current views on best practices in the use of task and delivery order contracts, in particular multiple award contracts, as authorized by the Federal Acquisition Streamlining Act (FASA). Their input helped to form the basis for this interim document. This document includes five appendices.