Severin Doctrine: It's Another Name for "Pass-Through-Plus" Claims

Best Practices Construction Law

Rhode Island DOT , the contractor on a bridge project had failed to include a material supplier in its list of vendors to the DOT. The subcontractor prepared an additional 70 shop drawings for total of 1,650 additional hours for which it sought additional compensation. The claim was presented by the contractor to the DOT.

Claims 48
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. Check all external restrictors for proper size and to verify the restrictor is installed per controls drawings. Obtain a current one-line drawing and verify meter is connected to the proper circuit. Safety goggles.