Remove Compensation Remove DOT Remove Drafting Remove Inspections
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect general arrangement of door and mechanism, mountings, standards, wind locks, anchor bolts, counterbalances, weather stripping, door sweeps etc.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

For example, DOT has experienced similar success using multiple award contracts at its Volpe Center. The goal was to expedite the process of providing draft RFPs to industry and obtaining their feedback, a process which can take six months to a year to finalize. Use of Multiple Award Contracts to Buy Other Services.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.” Sussex County fee reductions may include graduated property tax abatement over a 10-year period, as well as reductions in building permit, building code, planning and zoning, sewer review and sewer inspection fees.

Income 108