Remove Compensation Remove Drafting Remove Feasibility Remove Inspections
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect general arrangement of door and mechanism, mountings, standards, wind locks, anchor bolts, counterbalances, weather stripping, door sweeps etc.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Determining the feasibility of using other DoD contracts. The level of architectural/drafting support performed by the contractor (not to be interpreted to mean A-E services); 3.5.3.1.6. SABER Inspection and Acceptance. Determining the appropriate minimum and maximum contract amounts.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Energy Innovations Small Grant (EISG) Program: Provides up to $95,000 for hardware projects and $50,000 for modeling projects to small businesses, non-profits, individuals and academic institutions to conduct research that establishes the feasibility of new, innovative energy concepts. ” For more information, please visit this link.

Income 108
article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

If, however, specific requirements for services can be clearly defined so it is more feasible to use a performance-based service contract, or to award a single prime contract under the 8(a) Program or as a set-aside to help meet small business goals, that may be a preferable acquisition strategy.