Remove Compensation Remove Inspections Remove Permits Remove Reference
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect general arrangement of door and mechanism, mountings, standards, wind locks, anchor bolts, counterbalances, weather stripping, door sweeps etc.

article thumbnail

Job Order Contracting Basic Definitions

Job Order Contracting

It also includes a reference to the required construction Technical Specifications to be used. The person or firm identified as such in the Agreement and is referred to throughout the Contract Documents, the will be providing the JOC Construction Services. CONTRACTOR / AWARDED JOC CONTRACTOR. DETAILED SCOPE OF WORK (SOW).

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

New Maryland Real Estate Laws from the 2020 Legislative Session

Green Building Law Update

The Act also repeals a reference to an expired statutory deadline by which the governing body of an HOA was required to delete related recorded covenants or restrictions. The fund is supported by fees collected by local governments from home builders upon application for a construction permit. House Bill 1077 (Ch. Ground Leases.

Maryland 227
article thumbnail

Hiring a Contractor - Julian Construction Blog

Julian Construction

A contractor manages the entire project from start to finish, including architectural planning, securing any required building permits, as well as providing all of the materials, equipment and labor that will be needed. Also verify that the contractor is insured and carries workers’ compensation. Inspection Consultation.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

Each project will encompass detailed line item construction task and reference specifications encompassing improvements, alterations, renovation, remodeling, major repairs, and minor new construction associated with ORGANIZATION NAME structures and properties. coefficient (reference table of allowable overhead). authorization.

Contract 100
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Internal Revenue Code Credits Adopted by Reference (AS 43.20.021): Under Alaska’s blanket adoption of the IRC, taxpayers can claim all federal incentive credits. The business must obtain a direct-pay sales and use tax permit from the State of Arkansas. Federal credits that refund other federal taxes are not allowed.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The capital credit is used only after all other deductions, losses or credits permitted under Titles 40 and 41 of the Code of Alabama 1975. The business must obtain a direct-pay sales and use tax permit from the State of Arkansas. This credit cannot be carried forward or back, and cannot be used to generate a refund to the taxpayer.

Income 75