Remove Compensation Remove Inspections Remove Permits Remove Schedule
article thumbnail

September 2015 newsletter

FDR Safety

Documentation of their Experience Modification Rating, which measures Workers Compensation claims experience. Copies of all required permits and certifications. Does the contractor have a plan to do inspections? If the contractor uses trucks and equipment, is there an equipment inspection program? Get their commitment.

Safety 120
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This work should be scheduled at non-peak hours. Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect gear box, change or add oil as required. Review manufacturer’s instructions.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting Basic Definitions

Job Order Contracting

JOC construction services work that is unsatisfactory, faulty, omitted, incomplete, deficient, or does not conform to the requirements of the Contract Documents, directives of Owner’s Authorized Representative, or the requirements of any inspection, reference standard, test, or approval specified in the Contract Documents. EXTRA WORK.

Contract 100
article thumbnail

Hiring a Contractor - Julian Construction Blog

Julian Construction

A contractor manages the entire project from start to finish, including architectural planning, securing any required building permits, as well as providing all of the materials, equipment and labor that will be needed. Also verify that the contractor is insured and carries workers’ compensation. Inspection Consultation.

article thumbnail

Innovation Is Thriving In Arizona

Business Facilities

Furthermore, Arizona is a right-to-work state with a very low unionization rate, one of the lowest unemployment insurance tax rates in the nation, and workers compensations rates that are much lower than the national average. In 2016, U.S.

Arizona 76
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

project task/line item, a full description in plain English, a unit of measure and a corresponding unit price, including labor, material, and equipment details, and an associated approved contractor coefficient are to be the basis for Contractor compensation. Scheduling. Field Office Expense. Field Office Personnel. Job Conditions.

Contract 100
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 20 List of Schedules. 00 31 13 Preliminary Schedules. Preliminary Project Schedule. Preliminary Construction Schedule. 00 31 43 Permit Application. 00 31 46 Permits. 00 43 73 Proposed Schedule of Values Form. 00 43 83 Proposed Construction Schedule Form. 00 01 20 List of Schedules.