Remove Concrete Remove Fabrication Remove Schedule Remove Structural Engineering
article thumbnail

BIM for Reinforced Concrete – From Design to Detailing in One Model

BIM & Beam

This is the third blog post in a series that discusses the advantages of working on concrete projects in a BIM process for structural engineers. Take, for example, a precast concrete wall. Revit-model-driven structural-analysis. The structural engineer creates the analytical model and structural system.

article thumbnail

Guidelines for rebar detailing of RCC structures

Construction Cost Estimating

Reinforcement Detailing or Rebar detailing is a detailed construction engineering process normally accomplished by the Rebar fabricators, structural engineering consultants or the contractors for generating ‘shop/placing’ drawings or shop drawings and bar bending schedule of steel reinforcement for construction.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Learn What’s New in Revit 2019 for Structural Engineers and Detailers

BIM & Beam

Steel components like plates, bolts, anchors, shear studs, and welds can now be placed in the 3D model to connect structural members together. Having a more accurately defined design model in Revit also enables a better interoperability with Advance steel for steel detailing and fabrication. Standard and Custom Connections.

article thumbnail

Reaching a new level of sophistication with panelized construction

Construction Specifier

Construction of wall, floor, and roof systems offsite has multiple advantages, including compressing the project schedules, reducing site labor and waste, improving consistency and quality control, and increasing safety for workers. However, all will have the structural skeleton of the frame.

article thumbnail

COMMON STRUCTURAL FAILURE CAUSES

The Constructor

The most common causes of structural failures are: (1) Poor communication between the various design professionals involved, e.g. engineers involved in conceptual design and those involved in the supervision of execution of works. (2) 2) poor communication between the fabricators and erectors. (3)

Concrete 177
article thumbnail

DEFLECTIONS IN DETERMINATE TRUSSES

The Constructor

The displacement can be computed as ……………. (1) In such cases, applying the principle of virtual work, ………………….2(a) 2(a) Where, = change in length of member k, = change in thermal expansion of member K = change in temperature.

Concrete 128
article thumbnail

How We Built The New American Home 2021

Pro Builder

Fortunately, we were off to a great start and were ahead of schedule on this 5,536-square-foot, three-story detached townhouse when COVID-19 restrictions were enacted last March, and our amazing team pulled together, working tirelessly to deliver a high-performance, show-stopping home amidst these unprecedented challenges. . CMU Construction.

Florida 98